Similar Projects
Twins Auto of Dublin - Storage and Display Area Expansion
New Construction, Demolition
Conception
Dublin, OH 43017

Lateral Lining - Blueprint North Linden 1, Hudson McGuffey - City of Columbus
Infrastructure
Conception
$10,071,998 CJ est. value
Columbus, OH 43215

McNaughten Site
New Construction, Infrastructure
Design
$81,000,000 CJ est. value
Columbus, OH 43213

Bright Road Senior Housing & Healthcare Residences
New Construction, Infrastructure - 420,000 SF
Design
$55,000,000 CJ est. value
Dublin, OH 43017

ODOT West Broad Complex
New Construction, Infrastructure
Bidding
$83,594,000 CJ est. value
Columbus, OH 43228

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

RFQ Design - DSFM Building Renovations and New Training Structure Packages - 2 & 3
New Construction, Renovation, Infrastructure - 7,250 SF
Post-Bid
$2,005,600 CJ est. value
Reynoldsburg, OH 43068

Ohio Department of Agriculture - New Animal Disease Diagnostic Lab
New Construction, Infrastructure
Post-Bid
$71,730,000 CJ est. value
Reynoldsburg, OH 43068

Minerva Park Community Building
Addition, Demolition, Renovation, Infrastructure - 7,537 SF
Results
$3,153,000 CJ est. value
Columbus, OH 43231

Weathering Steel Pole Coating and Restoration
Infrastructure, Alteration
Results
$125,000 est. value
Westerville, OH

Castings Commerce Park
New Construction, Infrastructure - 815,000 SF
Construction
$100,000,000 CJ est. value
Columbus, OH 43207

Castings Commerce Park
New Construction, Infrastructure - 815,000 SF
Construction
$100,000,000 CJ est. value
Columbus, OH 43207

Chick-fil-A #4826 / Columbus
Demolition, New Construction, Infrastructure - 5,141 SF
Pending Verification
$800,000 CJ est. value
Columbus, OH 43214

New Passenger Terminal at John Glenn Columbus International Airport
New Construction, Infrastructure
Pending Verification
$1,137,000,000 CJ est. value
Columbus, OH 43219

Sawmill Road Streetlighting - City of Columbus
Infrastructure
Conception
$800,000 CJ est. value
Columbus, OH 43235

Last Updated 03/15/2023 09:37 AM
Project Title

Rickenbacker Industrial Center - Phase 2

Physical Address View project details and contacts
City, State (County) Lockbourne, OH 43137   (Franklin County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $110,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a multi-building industrial development in three phases: Phase 1 will consist of a 1,000,000-square-foot speculative building Phase 2 will consist of either a 1,000,000-square-foot building or two 512,000-square-foot buildings Phase 3 will consist of two buildings between 250,000 and 290,000 square feet As of March 15, 2023, Phase 2 is in the planning stages. An architect and general contractor have been selected. Information regarding subcontractor bidding opportunities has not been released. A construction schedule has not been announced for Phase 2.

Details

1,024,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents