Similar Projects
Improvements to the Sidewalk and Bike Lanes Along El Camino Street and El Rio Street Precinct 1
Infrastructure
Bidding
TX

Construction of Sidewalk and Bike Lane along Almeda (FM 521) between Holly Hall Street and Old Spanish Trail for Harris County Precinct 1
Infrastructure
Bidding
Houston, TX 77282

Tirz 25 Sidewalk, Curbs, and Curb Ramps Project - Along Various Major Thoroughfares
Post-Bid
Houston, TX 77002

Restore Driveway-Brick Paver
Post-Bid
Houston, TX

Intramural Gravel Lot Conversion
Results
Houston, TX 77204

Elmside/Woodchase Path
Results
$2,900,000 to $3,300,000 est. value
Houston, TX 77042

Construction of Sidewalk at Summerwood Community (Phase 2) along West Lake Houston Parkway from Woodson Park Drive to Coopers Hawk Drive, Precinct 1
Infrastructure
Bidding
Houston, TX 77044

2021 Annual Sidewalk Improvements
Post-Bid
Pasadena, TX

Sidewalk and Ramp Repair at Cuney Homes Apartments
Results
Houston, TX 77004

HPW - Citywide Work Orders for CDSF Project 8
Infrastructure
Bidding
$3,000,000 est. value
Houston, TX

Upper Brays Bayou Greenway (BR 26) - Braeburn Glen Boulevard to Eldridge Parkway
Post-Bid
$11,100,000 to $12,500,000 est. value
Houston, TX 77074

Construction of Sidewalks and Related Items for Harris County Precinct 3
Term Contract
Results
Less than $2,236,335 est. value
Houston, TX 77002

Pedestrian Trail Along Fondren Diversion Channel from West Bellfort Avenue to Willowbend Boulevard Precinct 1
Infrastructure
Bidding
Houston, TX 77282

Deer Park Hike and Bike Trails - Phase 1
Post-Bid
$400,000 est. value
Deer Park, TX

Curbs and Curb Ramps Assessment Project - Hiram Clarke Road
Results
Less than $30,971 est. value
Houston, TX 77002

Last Updated 02/07/2022 04:37 AM
Project Title

Construction of Pedestrian Trails Along Brays Bayou at Westpark Drive Precinct 3

Physical Address View project details and contacts
City, State (County) Houston, TX 77282   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents