Similar Projects
Construction Manager at Risk Services for the Expanded Capacity
Post-Bid
Less than $15,000,000 est. value
Boston, MA

Boilers Annual Preventative Maintenance, Service Calls, Parts And Components
Post-Bid
Boston, MA

Operations and Facilities Maintenance Services at the John F. Kennedy Federal Building in Boston, MA
Results
Boston, MA 02203

Boiler Repairs - Barnes Building - 495 Summer Street, Boston, MA 02210
Results
Boston, MA 02210

Boilers Annual Preventative Maintenance Contract
Term Contract
Post-Bid
Boston, MA

Provide Preventive Maintenance - General Bid
Results
Less than $7,128,837 est. value
Boston, MA 02108

J--Boiler Services VA Medical Centers New England
Post-Bid
Hartford, Newington, West Haven, CT - Bedford, Jamaica Plain, Leeds, MA - Manchester, NH - Providence, RI 06111

Massachusetts Information Technology Center, MEP Preventive Maintenance Contract - General Bid
Results
Less than $653,474 est. value
Chelsea, MA 02139

Purchase and Installation of Drinking Fountains - Various Schools
Post-Bid
Chelsea, MA

Barnstead Laboratory Water Purifcation System
Results
Boston, MA 02129

Remove and Replace the Existing 175 Gallons PVI Turbopower Domestic Hot Water Heater
Post-Bid
Less than $38,000 est. value
Winthrop, MA 02152

Air Compressor System Services
Results
$130,000 est. value
Chelsea, MA

Boiler Replacement and Associated Repairs at the Hernandez School and Lyndon School - General Bid
Results
Roxbury, MA

Trade Contractor FY20-22 Authority Wide Mechanical Term Contract - General Bids
Term Contract
Results
Less than $2,000,000 est. value
East Boston, MA

Artists Residence Hall Rooftop MAU Units - General Bids
Results
$900,000 est. value
Boston, MA 02115

Reported 02/01/2020 12:00 AM
Project Title

Hydronic Piping, Phase 3, Thomas P. O'Neill Federal Building, Boston, MA

Physical Address View project details and contacts
City, State (County) Boston, MA   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Thomas Phillip O’Neill Federal Building in Boston, MA, was constructed in 1985 with over 850,000 square feet of office and support floor area. The hydronic piping systems that provide heating and cooling throughout the building have extensive exterior corrosion from the accumulation and trapping of condensation within the insulation and are at risk of failure. This project systematically replaces aging hydronic piping on the North elevation (Phase 3). This project will provide for a complete replacement of all risers, valves, main and branch piping lines, shut-offs, insulation, fire stopping and all other accessories. Work will be performed both on and off hours during the non-heating season. The tenant agencies will have a say on when work can be performed in their space. Daytime work is in an occupied office building setting. Work includes, but is not limited to, the opening of gypsum wallboard (GWB) columns to access the risers, acoustical ceiling work to access the branch piping, moving of furniture, protecting existing building finishes and furnishings, patching/painting of GWB, and re-installation of acoustical ceiling systems.

Details

Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Hydronic Piping and Pumps.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents