Similar Projects
Airfield Rubber Removal and Striping
Alteration
Design
$25,000 to $100,000 est. value
Grissom ARB, IN

Construct Taxiway A1 Connector
Infrastructure
Bidding
Fort Wayne, IN 46825

Runway Extension Phase 2 - Grading & Drainage
Post-Bid
Zionsville, IN 46077

Midfield Taxiways R, P, H and N Rehabilitation
Post-Bid
Indianapolis, IN 46241

International Airport Gary - Rehabilitate Taxiway A - Phase 1
Results
Gary, IN 46400

Runway Safety Area Grading Improvements
Results
Gary, IN 46400

Terminal Apron and Taxiway G Rehabilitation
Infrastructure
Post-Bid
Anderson, IN 46017

Taxilane Construction - Paving
Results
Muncie, IN 47303

Rehabilitate Taxiway "A", Phases 2
Infrastructure
Post-Bid
Gary, IN 46406

2020-2 Street Paving
Results
Less than $200,000 est. value
Chalmers, IN

Runway 5R-23L and Taxiway D Phase 1
Infrastructure
Post-Bid
IN 46241

T-Hangar Taxiway
Results
Marion, IN 46953

Rubber Removal and Striping at Grissom Air Reserve Base
Term Contract
Post-Bid
Grissom ARB, IN

2021 T-Hangar Taxilane and Southwest Arpon Rehabilitation
Results
Columbus, IN 47203

Grissom Air Reserve Base Runways Project Industry Day
Term Contract
Post-Bid
$25,000,000 to $100,000,000 est. value
Grissom ARB, IN

Reported 03/01/2022 12:00 AM
Project Title

Airfield Paving and Lighting

Physical Address View project details and contacts
City, State (County) IN   (Miami County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the repair of Airfield Lighting Circuits/ Repair Taxiway G / Repair Overruns/ Repair Runway 05-23 and Shoulders/ Repair Taxiway C. The project will involve approximately 3,290,000 square feet of mill and overlay work, and the approximate total full depth replacement is 471,000 square feet of Portland Cement Concrete (PCC). The proposed project includes: Repairing throats at Taxiway C to full depth to include conducting a repair of the north and south Taxiway C throats by removing all layers of pavement at full depth to subgrade and replace with PCC. Repairing Taxiway G sections to include removing the Asphalt over Portland cement Concrete (APC) at full depth to subgrade and replacing with Repairing the full length of Runway 05-23 using mill and overlay and full depth PCC methods as designed by variable milling of surface and overlay with asphalt concrete (AC) and repairing 1,200 LF to full depth with Repairing shoulders for the entire length of the runway by variable milling of surface and overlaying with asphalt Repairing the asphalt concrete paved overruns at the 23 and 05 ends of the runway by milling the surface and overlaying with asphalt Repairing by replacement of airfield lighting circuits (1) the complete approach system for runway 05 (2) the threshold light bar at the end of runway 23 (3) feeder cables from home runs at both 23 and 05 ends (4) Taxiway G edge lighting

Details

Division 26 - Electrical, Exterior Lighting.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents