Similar Projects
Wet Utilities Job Order Contract-Multiple Locations
Demolition
Design
$2,000 to $1,000,000 est. value
Washington, DC - Indian Head, Patuxent River, MD - Dahlgren, VA

Walnut Avenue Bicycle and Pedestrian Accommodations 5th Street to Town West Limits
Bidding
$545,250 est. value
Vinton, VA 24179

Dewatering Services
Term Contract
Bidding
Suffolk, VA

J042--Bldg. 14 Hydrant Repair Hampton VA Medical Center
Post-Bid
$100,000 to $250,000 est. value
Hampton, VA 23667

Branch's Baptist Stormwater Retrofit
Post-Bid
Richmond, VA 23224

Maintenance Services for Water Filtration System
Results
Portsmouth, VA

Cathodic Protection
Term Contract
Results
Leesburg, VA

3rd Avenue Water Main Replacement
Infrastructure
Bidding
$530,000 est. value
Suffolk, VA 23434

Pressure Reducing Valve - Annual Maintenance
Term Contract
Post-Bid
Fredericksburg, VA

Briarfield Drive Outfall Improvements
Results
Chesapeake, VA

Blackstone Hotel Water & Sewer Extensions
Alteration
Post-Bid
Suffolk, VA

Annual Water Meter Replacement
Term Contract
Results
Charlottesville, VA

New Water Main Installation - Stonefield Lane
Infrastructure
Post-Bid
Charlottesville, VA

Verdon Road Waterline
Results
VA

Automated Water Meter Upgrade
Infrastructure
Post-Bid
Bridgewater, VA

Last Updated 07/01/2022 10:38 AM
Project Title

Smithfield Route 10 Waterline Booster Pump Station

Physical Address View project details and contacts
City, State (County) Smithfield, VA 23430   (Isle of Wight County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a water / sewer project in Smithfield, Virginia. Working plans call for the construction of a water / sewer project. The Conditional Use Permit Request was recommended for approval by the Isle of Wrights Planning commission May 24, 2022. Information regarding contractor has yet to be determined. Although a firm timeline has yet to be announced, construction is estimated to begin third quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents