Similar Projects
Last Updated | 07/28/2021 04:24 PM |
Project Title | Concessions Building Repair |
Physical Address | View project details and contacts |
City, State (County) | Hanahan, SC (Berkeley County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Clubhouse/Social Club |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $55,156 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | FRONT CANOPY: 618 SF Walls 373 SF Ceiling Total 991 SF Walls & Ceiling 42 SY Flooring 78 LF Floor Perimeter 78 LF Ceiling Perimeter Description of work: Stain and finish wood siding Under side of exposed canopy framing and trim Mask and prep for paint- plastic, paper, tape SIDE CANOPY: 618 SF Walls 373 SF Ceiling Total 991 SF Walls and Ceiling 42 SY Flooring 78 LF Floor 78 LF Ceiling Perimeter Description of Work: R&R Siding- Plywood panel – stain 8 sheets T1-11 R&R Sheathing – Plywood – 1//2” CDX 8 sheets R&R Trim Board – 1”x8” installed (Cedar) Fascia board Rafters – 2x8 repair Stain and finish wood siding under side of exposed canopy framing and trim Mask and prep for paint – plastic, paper, tape (per LF) MEN’S RESTROOM: 670 SF Walls 367 SF Ceiling 1037 SF Walls & Ceiling 367 SF Floor 41 SY Flooring 84 LF Floor Perimeter 84 LF Ceiling Perimeter Description of Work: Drywall tape joint/repair – per LF Seal the ceiling w/latex-based stain blocker – one coat Paint ceiling – two coats Mask and prep for paint – plastic, paper, tape (per LF) WOMEN’S RESTROOM: 697 SF Walls 418 SF Ceiling Total Walls and Ceiling 1,115 SF 418 SF Floor 47 SY Flooring 88 LF Floor Perimeter 88 LF Ceiling perimeter Description of Work: Drywall tape joint/repair – per LF Seal the ceiling w/latex-based stain blocker – one coat Paint ceiling – two coats Mask and prep for paint – plastic, paper, tape (per LF) KITCHEN: 824 SF Walls 582 SF Ceiling 1,406 SF Walls and Ceiling 582 SF Floor 65 SY Flooring 103 LF Floor Perimeter 103 LF Ceiling Perimeter Description of Work: R&R 5/8” drywall – hung, taped, floated, ready for paint Drywall tape joint/repair per LF R&R Batt insulation – 10” R30 unfaced batt Seal the ceiling w/ latex based stain blocker – one coat Paint ceiling – two coats Seal exposed wall area w/ latex based stain blocker – one coat Paint exposed wall area – two coats Mask and prep for paint – plastic, paper , tape (per LF) Detach and Reset Commercial Hood System Include electrical for hood, fire suppression and inspection ROOF: 3,543 Surface Area 36 Number of Squares 293 Total Perimeter Length 101 Total Ridge Length 123 Total Hip Length Description of Work: R&R Standing seam metal roofing ICE and Water Barrier – High Temp R&R Sheathing – plywood – ½” CDX 28 sheets Re-Nailing of roof sheathing – complete re-nail Truss – Repair existing R&R Trim board – 1”x8” installed (Cedar) Fascia board near women’s room Prime & Paint exterior soffit – wood Prime and paint exterior fascia wood 6” – 8” wide Mask and prep for paint – plastic, aper, tape (per LF) |
||||||||||||||||||||||||||||||||
Details | Clubhouse/Social Club, Renovation.
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |