Similar Projects
Prime Data Centers Sacramento Building 2
New Construction, Infrastructure - 150,000 SF
Design
$150,000,000 CJ est. value
McClellan, CA 95652

Gifford Place
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
San Jose, CA 95126

At&T Telecommunication Facility
New Construction
Pending Verification
Santa Rosa, CA 95403

Design/Build - DATA Center Renovations
Renovation
Post-Bid
$25,000,000 est. value
Bridgeport, CA

AT&T Modify Existing Wireless Communication Facility
Renovation
Design
San Francisco, CA 94109

Communication Facility Remodel
Renovation
Design
San Francisco, CA 94103

Communication Facility Modification
Renovation
Design
San Francisco, CA 94117

LLNS Digital Infrastructure Capability Expansion (DICE) Facility
New Construction, Build-Out
Post-Bid
Livermore, CA

Echo Park
New Construction, Infrastructure - 5 SF
Pending Verification
$20,000,000 CJ est. value
Los Angeles, CA 90026

RFQ D/B - Ground Based Strategic Deterrent (GBSD) Consolidated Maintenance Facility at Vandenberg SFB
New Construction, Infrastructure - 13,789 SF
Conception
$250,000,000 CJ est. value
Vandenbrg AFB, CA 93437

Microsoft Corporation Data Center / San Jose
New Construction
Conception
$40,000,000 est. value
San Jose, CA 95131

Primary Datacenter Upgrade and Establishment of Backup Datacenter
Renovation
Post-Bid
$100,000 CJ est. value
Baldwin Park, CA 91706

Warner Bros. Ranch Lot Redevelopment
New Construction, Infrastructure - 320,000 SF
Pending Verification
$500,000,000 CJ est. value
Burbank, CA 91505

Replacement of Citywide Radio System
Renovation
Post-Bid
$10,000,000 CJ est. value
Simi Valley, CA 93065

Reported 07/28/2022 12:00 AM
Project Title

Yosemite National Park Emergency Communications Center Expansion and Remodel

Physical Address View project details and contacts
City, State (County) El Portal, CA 95318   (Mariposa County)
Category(s) Commercial
Sub-Category(s) Communication Building
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This Project will provide for a complete renovation to convert approximately 530 square feet of a current lobby/atrium area into additional office space for the ECC, renovation of the remaining approximately 130 square feet of the lobby/atrium area to retain a functional entryway including reconfiguration of a steel and concrete stairway to the second floor, installation of a split-unit unit HVAC system, installation of a 150 kilowatt generator and associated electrical equipment, and approximately 80 linear feet of new steel security fencing with personnel gate. General Description of the Work The Emergency Communications Center (ECC) at Yosemite National Park provides 24-hour all-risk communications for Yosemite National Park, Lassen Volcanic National Park, Devils Post pile National Monument, and Santa Monica Mountains National Recreation Area. The ECC is located within a small office within the 96,000 square foot El Portal Maintenance Facility Building. The ECC requires additional office space and electrical equipment in order to accommodate new operational requirements. This Project will provide for a complete renovation to convert approximately 530 square feet of a current lobby/atrium area into additional office space for the ECC, renovation of the remaining approximately 130 square feet of the lobby/atrium area to retain a functional entryway including reconfiguration of a steel and concrete stairway to the second floor, installation of a split-unit unit HVAC system, installation of a 150 kilowatt generator and associated electrical equipment, and approximately 80 linear feet of new steel security fencing with personnel gate

Details

Communication Building, Addition, Communication Building, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents