Similar Projects
Spring Rock Residential Community
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Kuna, ID 83634

2023 Bond - Nampa School District
Demolition, New Construction, Infrastructure, Renovation
Conception
$210,200,000 CJ est. value
Nampa, ID 83651

Replace Sink
Alteration
Post-Bid
ID

Replace Hallway Flooring
Renovation, Alteration
Post-Bid
ID

Elementary School Cafeteria Addition and Title One Remodel
Renovation, Addition
Results
$1,300,000 est. value
Pinehurst, ID 83850

Design Build Services for - Construction of K-12 School Facility
New Construction
Results
ID

Naples Elementary School Addition and Remodel and Mount Hall Elementary School Remodel
Addition, Demolition, Renovation, Infrastructure
Construction
$2,125,007 CJ est. value
Bonners Ferry, ID 83805

Blackfoot Elementary School
New Construction, Infrastructure - 46,313 SF
Construction
$10,000,000 CJ est. value
Blackfoot, ID 83221

Mayfield Springs Mixed-Use
New Construction, Infrastructure - 55,000 SF
Pending Verification
$900,000,000 CJ est. value
Mountain Home, ID 83647

2023 Bond - Kuna Joint School District
Addition, Demolition, New Construction, Renovation, Infrastructure
Conception
$111,400,000 CJ est. value
Kuna, ID 83634

New Jerome Elementary School
New Construction - 73,932 SF
Post-Bid
$21,000,000 est. value
Jerome, ID 83338

Timberline Elementary Classroom Addition
Addition - 4,100 SF
Results
Weippe, ID 83553

2023 Bond - Castleford School District
Renovation
Conception
$6,000,000 CJ est. value
Castleford, ID 83321

Construction Manager - Additions and Remodeling to NFHS, AES, HFE, SFHS, and CTE and SFJHS Buildings
Renovation, Addition
Post-Bid
$100,000 est. value
Saint Anthony, ID

Horizon Elementary Addition - Demolition, Concrete, Millwork, and Fire Suppression
Addition - 3,125 SF
Results
$1,500,000 est. value
Jerome, ID 83338

Last Updated 03/28/2023 04:44 PM
Project Title

Park & Pioneer HVAC Projects

Physical Address View project details and contacts
City, State (County) Weiser, ID 83672   (Washington County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This is a Construction Management/General Contracting Project. Bids for separate work packages must be on the bid forms enclosed in the bid documents. Performance and Payment Bonds in the amount of (100%) of the Contract amount may be required within (10) days after receipt of a properly prepared agreement between Beniton and the Trade Contractor. Costs for bonds shall be included as an alternate to the trade contractor's bid amount.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents