Similar Projects
A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Conus Drilling Services - St. Louis District
Term Contract
Bidding

Architectural/Engineering Design Services
Infrastructure
Bidding
IL

Water Tank Inspections, OCONUS and CONUS
Post-Bid
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Post-Bid
$70,000 to $10,000,000 est. value
Washington, DC

USDA Forest Service Eastern Region Architect & Engineer Services IDIQ
Results
$2,500 to $5,000,000 est. value

IL 60/IL 83 Phase II
Results
Less than $94,000,000 est. value
IL

HUD Nationwide Construction Inspection Services
Term Contract
Design
Less than $50,000,000 est. value

National Guard Bureau, Region 6, Architect and Engineering Indefinite Delivery Indefinite Quantity Contract for Vertical Projects
Post-Bid
$110,000 to $35,000,000 est. value

Various Phase III Quality Assurance for Aggregate/HMA/PCC and Other Material Inspection
Results
Less than $2,000,000 est. value

National Guard Bureau, Region 3, Architect and Engineering Indefinite Delivery Indefinite Quantity Contract for Horizontal Projects
Post-Bid
$100,000 to $90,000,000 est. value

US Route 41 at Deerpath (Pump Station #38), Phase III
Results
IL

Unrestricted A-E Environmental IDIQ MATOC for A-E Environmental Support Services
Post-Bid
$10,000 to $49,000,000 est. value

Florida Windspeed UFC Update
Results

Last Updated 07/22/2021 06:04 AM
Project Title

IL Route 132, West of Sheehan Dr. to Munn Rd. Dryland Bridge Replacement, Phase III

Physical Address View project details and contacts
City, State (County) Lindenhurst, IL 60046   (Lake County)
Category(s) Professional Services
Sub-Category(s) Engineering, Inspection Services
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase III engineering is required to provide construction inspection services for the above subject improvement. Work includes, but is not limited to, The scope of work includes the complete removal and reconstruction of a dry land bridge, replacement of a box culvert, opening and length of the reinforced concrete box culvert will be increased to improve flow conveyance and accommodate the widening of Illinois Route 132, reconstruction of IL-132 begins at the intersection of Sheehan Drive and run east along the existing alignment to the intersection with Munn Road, flood mitigation, construction of a shared-use path, resurfacing, curb and gutter replacement, ADA ramp improvements, pavement widening, profile modifications to increase freeboard, dryland bridge replacement, sidewalk work, and all incidental and collateral work necessary to complete the project as shown on the plans and as described in the special provisions.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents