Similar Projects
Robert Street Pedestrian-Bike Pathway - City of Cody
Infrastructure
Conception
$450,000 CJ est. value
Cody, WY 82414

Robert Street Pedestrian-Bike Pathway - City of Cody
Infrastructure
Conception
$450,000 CJ est. value
Cody, WY 82414

RFQ - Yellowstone, Grand Teton and Surrounding Area MATOC, 2024-2028
Term Contract
Bidding
$150,000,000 CJ est. value
Yellowstone National Park, WY 82190

RFP Construction Manager at Risk Services - Construction of Heavy Equipment Maintenance Shop Park County Powell Landfill
New Construction, Infrastructure
Bidding
$650,000 CJ est. value
Powell, WY 82435

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

District 5 Crack Seal
Infrastructure
Results

Rading, Bituminous Pavement Surfacing, Slide Stabilization Rock, Aggregate Columns, Temporary Concrete Barriers and Miscellaneous Work
Infrastructure
Results
WY

Rocky Mountain Granite
New Construction, Infrastructure - 5,000 SF
Pending Verification
$600,000 CJ est. value
Cody, WY 82414

Rocky Mountain Granite
New Construction, Infrastructure - 5,000 SF
Pending Verification
$600,000 CJ est. value
Cody, WY 82414

Infrastructure Improvements - East Sheridan Intersects with Beacon Hill Road
Infrastructure
Conception
$1,250,000 CJ est. value
Cody, WY 82414

Roadside
Infrastructure
Bidding
$500,000 CJ est. value
Powell, WY 82435

WY NPS YELL 12(2) Yellowstone River Bridge
Demolition, New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Yellowstone National Park, WY 82190

Grading, Milling Plant Mix, Bituminous Pavement Surfacing, Bridge Rehabilitation, Temporary Concrete Barrier, Guardrail And Miscellaneous Work
New Construction, Infrastructure
Results

Sweets Soda Shoppe
New Construction, Infrastructure - 502 SF
Pending Verification
$200,000 CJ est. value
Cody, WY 82414

Last Updated 01/24/2023 07:05 AM
Project Title

Willwood to Emblem Coon Creek Section / WY 32

Physical Address View project details and contacts
City, State (County) Powell, WY 82435   (Park County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2027
Bids Due View project details and contacts
Estimated Value $2,864,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Character of Work : Pavement Resurface Length : 5.20 As of January 24, 2023, the project is in Conceptual status. Anticipated Construction year is 2027. WYDOT - Willwood to Emblem Coon Creek Section / WY 32 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents