Similar Projects
Boiler Replacement
Bidding
Chesnee, SC 29323

Mechanical Systems Water Treatment Services
Bidding
Charleston, SC 29424

Mechanical Package (HVAC) for Dean Hall
Post-Bid
Moncks Corner, SC 29461

900 Building Boiler Replacement
Post-Bid
$50,000 to $100,000 est. value
Graniteville, SC 29829

Hydraulic Water Chiller
Results
Charleston, SC 29404

J--Cynosure Laser & Chiller / Preventative Maintenance Service
Results
Charleston, SC 29403

10 X 10 Walk in Cooler, Installation, Demo of Existing Cooler
Bidding
Clemson, SC

Rebuild Centrifuge No.1
Post-Bid
West Columbia, SC

J--Water Treatment Boiler and Chiller Plant SDVOSB or VOSB Set-Aside _ Dependent Upon Responses Received
Results
Columbia, SC

Steam Fired Domestic Water Heater
Bidding
Columbia, SC

Remove and Install New Gas Water Heaters
Term Contract
Post-Bid
West Columbia, SC 29169

J-- Boiler Plant Semi and Annual Maintenance
Results
Charleston, SC 29401

J045--Boiler Life Expectancy and Damage Assessment Inspection
Bidding
Columbia, SC 29209

Adjutant General Water Heater Replacement
Post-Bid
$63,000 to $73,000 est. value
Columbia, SC

CF Haynsworth Federal Building Chiller Replacement
Results
$250,000 to $500,000 est. value
Greenville, SC 29601

Reported 02/14/2020 12:00 AM
Project Title

Replace Boiler NNPTC

Physical Address View project details and contacts
City, State (County) Goose Creek, SC   (Berkeley County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace Boiler – NNPTC Central Energy Plant, B2409 - Joint Base Charleston (Weapons Station - NNPTC): Furnish all labor, tools, equipment, and materials to complete - work will be conducted in Building 2409. Central Energy Plant (Building 2409) at NNPTC houses two (2) gas-fired boilers that provide steam to the adjacent Galley (Building 2402). One (1) of the existing boilers (Boiler #1) is not operational and it will be replaced under this contract. The second boiler will remain in place and must be operational throughout construction. The new boiler shall be designed for 150-psi steam and the operating pressure is 55-psi (adjustable).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents