Similar Projects
Sunnyvale Cleanwater Program Secondary Treatment and Dewatering and Sunnyvale Cleanwater Program Existing Plan Rehabilation Project
Infrastructure
Bidding
$45,000,000 est. value
Sunnyvale, CA

USCG Novato Demolish Water Tower and Building 125 Pump House
Demolition
Post-Bid
$250,000 to $500,000 est. value
Novato, CA

Tanks, Sumps and Accessories
Infrastructure
Post-Bid
West Sacramento, CA

Skyline Water Tank Replacement Project
Infrastructure
Results
Millbrae, CA 94030

Aboveground and Underground Storage Tanks Monitoring, Maintenance, Testing, and Repair Services
Term Contract
Results
Less than $500,000 est. value
Redwood City, CA 94063

Kern County Sheriff Lerdo Water Tank Replacement
Infrastructure
Post-Bid
Bakersfield, CA 93308

FWTP Backwash Tank Interior Cleaning
Term Contract
Results
$450,000 est. value
Sacramento, CA

La Crescenta East and West Reservoir Rehab and Coating Project
Renovation, Alteration
Post-Bid
$900,000 est. value
Glendale, CA 91214

Tank 5 and 12 Recoat and Repairs
Infrastructure
Results
$2,179,500 est. value
Modesto, CA 95355

Aboveground and Underground Storage Tank System Inspection, Testing, Maintenance, Repair and Certification Services
Infrastructure
Post-Bid
Sacramento, CA

Regional Groundwater Storage and Recovery Phase 2A
Infrastructure
Results
$3,600,000 est. value
Millbrae, CA 94030

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

Sodium Hypochlorite Improvements Project-Redesign
Infrastructure
Results
$300,000 est. value
Millbrae, CA

Waterman Road Water Treatment Plant Tank no. 2 Rehabilitation Project
Infrastructure
Post-Bid
$1,210,369 est. value
Elk Grove, CA 95624

Water Storage and Pumping Facilities
Infrastructure
Post-Bid
Fresno, CA 93723

Reported 12/01/2021 12:00 AM
Project Title

Downtown Tank Relocation & Replacement Project

Physical Address View project details and contacts
City, State (County) Dunsmuir, CA   (Siskiyou County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,400,000 to $3,800,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The Project consists of constructing a new 900,000-gallon welded steel tank and site improvements, three pressure reducing valve stations, one supervisory valve station, 900 feet of 12-inch water main, four new water services, two fire hydrants, existing tank demolition, and miscellaneous improvements, complete.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents