Reported 01/18/2019 12:00 AM
Project Title

Phase 2 Street, Drainage and Sidewalks Maple and Bolivar

Physical Address View project details and contacts
City, State (County) Bellaire, TX   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $2,156,646
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description This project involves the reconstruction of paving, drainage and sidewalk improvements on the following streets within the City of Bellaire: the 4500 block of Maple Street and the 500 block of Bolivar Street. The project includes the replacement of the existing asphalt and concrete pavement with a reinforced concrete curb and gutter street, the installation of new storm sewer, replacement of existing sidewalks or new sidewalks, and water and sanitary sewer adjustments.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents