Similar Projects
RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

Fox River Bluffs - Site Construction
Infrastructure
Bidding
$153,000 CJ est. value
Yorkville, IL 60560

Last Updated 07/22/2022 07:37 AM
Project Title

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties

Physical Address View project details and contacts
City, State (County) Schaumburg, IL 60194   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Job No. V-91-018-22, Various Phase III Construction Inspection Projects, Various Routes, Various Counties, Region One/District One This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on August 4, 2022, at 9:30 AM at the Region One/District One Office in Schaumburg. Phase III engineering services are required to assist department resident engineers/technicians on various construction projects throughout the District One area. Eight (8) to twelve (12) engineers and /or engineering technicians are anticipated to be required during the 2022 and 2023 and 2024 (if applicable) construction seasons. Typical assignments would include, but are not limited to, general construction inspection, project finalization and documentation, including PCC & bituminous concrete paving operations, drainage, patching, bridge structures, bridge painting and providing general assistance as a member of a field crew. Survey/layout services may be required. The Consultant will furnish a Project Manager and an adequate staff to perform the duties required to fulfill the engineering requirements in accordance with the departmental policies. This work may be in either English or metric units. The completion date for this contract will be 18 months after authorization to proceed. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project.. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). After all responses have been evaluated, firms may be asked to make oral presentations during the week of July 18, 2022. The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 019 - RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents