Similar Projects
Repplier Park Camera Installation Project
Renovation
Design
$200,000 CJ est. value
Banning, CA 92220

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Design and Construction of a Monitor Steel Frame Barn Building at the George A. Ingalls Event Center
New Construction, Term Contract, Alteration
Post-Bid
Norco, CA

Demuth Community Center Egress And Gym Improvements
Renovation, Alteration
Results
$750,000 to $950,000 est. value
Palm Springs, CA 92264

Shumway Ranch Site Improvements Project (Electrical)
Alteration
Results
$12,980 est. value
Indio, Mountain Center, CA 92201

Generator Installation
Renovation
Construction
$2,028,300 CJ est. value
Hemet, CA 92543

Rancho Mirage Library and Observatory Community Room Lighting Project
Renovation
Post-Bid
$300,000 CJ est. value
Rancho Mirage, CA 92270

Harrison Emergency Shelter Project - Phase 2
Renovation, Alteration
Results
$375,000 to $475,000 est. value
Corona, CA

RFP - Riverside Transmission Reliability (RTRP) Consultant Services
Term Contract
Post-Bid
Riverside, CA 92522

Electrical Maintenance and Installation Services
Alteration
Results
Palm Springs, CA 92262

67-12 KV Oil-Filled Transformer University T4 and LA Colina T2
Term Contract
Post-Bid
Riverside, CA 92522

Replacement of the Helipad Landing Lights
Alteration
Results
Riverside, CA 92522

As Needed Electrical Repairs for City Facilities and LLMDs
Term Contract
Post-Bid
Coachella, CA 92236

Gibraltar Drive Cable Replacement Project
Infrastructure, Alteration
Results
$481,000 est. value
Riverside, CA

Generator Preventive Maintenance and As-Needed Repair Services
Term Contract
Post-Bid
Temecula, CA 92590

Last Updated 03/23/2023 04:51 PM
Project Title

Corona High School Theatre Lighting System Project

Physical Address View project details and contacts
City, State (County) Corona, CA 92882   (Riverside County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $109,356 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this solicitation is to hire a single Contractor to complete the Corona High School Theatre Lighting System project. Bid shall be awarded to the lowest overall responsive bidder. Contractor will be required to complete the replacement of the lighting system in the theater at Corona High School. Questions Due Date: Feb 28th 2023, 4:00 PM PST The scope of work includes, but is not limited to, complete replacement of existing theatrical and house lighting fixtures to LED fixtures. Specifically, there will be a combination of 3 LED theatrical fixtures, warm white zoom ellipsoidal with barndoors, RGBAW zoom pars, and RGBW strip lights. Coverage should be overlapping in all areas of the stage. House lighting fixtures will include 50 watt warm white LED pendants over the audience area and 30 watt warm white recessed fixtures above walkways in the auditorium. Existing dimming circuits shall be converted as necessary to provide necessary power requirements, and new wall mounted control stations will be installed to create preset lighting memories for instant recall without the use of the existing theatrical lighting console. This project will commence as soon as its board approved. The estimated number of working hours for completion is forty (40) hours. Installing all the parts below and training the staff on the new system. 18-MP stage 9612754 RGBW Ellipsoidal LED Zoom fixtures 40-MP stage 9612712 RGBAW with Zoom LED 15-Blizzard lighting Motif Vignette RGBW LED strip fixtures 1-Blizzard Pipeline DMX Splitter 7-City Theatrical Multiverse Shoe Baby wireless DMX Transceivers 1-Trip Light SRW12US Wall mount Rack Cabinet 1-Furman M-8X2 Power Conditioner 37-Springtree 50 Wat Pendant Warm white LED House Lights 24-Springtree 30 Watt Recessed Warm White LED 3-Springtree DMX 1200 Drivers for LED Fixtures 4-Springtree SS-O Slave Wall Control Switch 1-Springtree SM-8 Desk control Switch 68-30" Black Safety Cables. All Work shall commence on March, 2023 and be completed by May, 2023. The Notice to Proceed shall not be issued prior to five (5) Days after the estimated March 21, 2023

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents