Similar Projects
Central Campus Electrical Upgrade Phase 2 Distribution
Post-Bid
$6,000,000 est. value
Raleigh, NC 27607

High Point Parking Deck Lighting Replacement
Post-Bid
High Point, NC 27260

Annual Construction Service Contract for Underground Distribution Construction
Term Contract
Results
Less than $1,000,000 est. value
Fayetteville, NC

34.5-12.47/7.2 kV Substation Switching Facilities and Accessories
Results
Washington, NC

Detention Center Switchgear Upgrades
Post-Bid
Castle Hayne, NC 28429

Electrical Services
Results
Charlotte, NC

Booker Dairy Road North Feeder New Overhead Addition
Addition
Post-Bid
Smithfield, NC 27577

Taxiway Lighting and Signage
Results
Less than $743,576 est. value
Gastonia, NC 28056

115 kV - 24.94/14.4 kV Substation Switching Facilities
Post-Bid
Statesville, NC

Generator Service Contract
Term Contract
Results
Less than $22,944 est. value
Angier, Cameron, Fuquay-Varina, Lillington, NC 27546

Replacement Emergency Generator
Post-Bid
Kinston, NC 28502

Residential Electrical Services
Results
Concord, NC

Ground Power Units
Post-Bid
Charlotte, NC

EOC/911 Center Generator Repair
Results
Wilmington, NC 28403

Wastewater Treatment Plant Centrifuge Controls and Motor Replacements
Post-Bid
$20,000 to $500,000 est. value
Valdese, NC

Last Updated 04/20/2021 04:13 PM
Project Title

Kerr Lake Regional Water Treatment Plant (KLRWTP) High Service Pump No. 3 and Generator Additions

Physical Address View project details and contacts
City, State (County) Henderson, NC   (Vance County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,800,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The replacement of a 400 HP high service pump with a 750 HP high service pump with medium voltage variable frequency drive and associated pipe, valves and fittings. Addition of generators with automatic transfer switches at two water booster stations. Addition of valves and electrical connections for portable generator use during power outages at several meter, valve and water tanks associated with the water distribution system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents