Similar Projects
Seal Coat Resurfacing
Infrastructure
Bidding
$400,000 est. value
Sidney, IL

Interstate Resurfacing SMART Overlay
Infrastructure
Bidding
$4,000,000 est. value
Champaign, IL 61822

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Curbanas/Parklets Decking System
Post-Bid
Urbana, IL

Resurfcing Maplewood Drive From the North City Limits of Rantoul to Veteran's Parkway in Rantoul
Results
Rantoul, IL

2021 General HMA Paving
Results
Less than $241,920 est. value
Mahomet, IL

Indian Grocery Store
Renovation, Alteration - 5,100 SF
Construction
Champaign, IL 61820

South Mahomet Road Utility Extensions
Post-Bid
Mahomet, IL 61853

Microsurfacing and Manhole Adjustments
Results
Less than $247,413 est. value
Mahomet, IL

2021 Infrastructure Maintenance
Post-Bid
Champaign, IL

Asphalt Repair and Reseal
Results
Less than $300,000 est. value
Tolono, IL

2021 Asphalt Sealing
Post-Bid
Less than $15,000 est. value
Champaign, Urbana, IL 61822

2021 Bituminous Street Improvements
Results
Champaign, IL

Replacement of Sidewalk Ramps, PCC Sidewalk, Curb and Gutter, and PCC Pavement Patching.
Alteration
Post-Bid
Homer, IL 61849

2021 Asphalt Street Improvements
Results
Champaign, IL

Last Updated 06/09/2022 11:01 PM
Project Title

2022 Concrete Project Including PCC Pavement Patching, ADA Sidewalk and Ramp Reconstruction, Various Locations and Tin Cup Sidewalk Gap Project

Physical Address View project details and contacts
City, State (County) Mahomet, IL   (Champaign County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $185,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of PCC pavement patching, sidewalk replacements, upgrading existing sidewalk ramps to ADA standards, and filling a sidewalk gap at Tin Cup Road (includes culverts and minor earthwork). Quantities include: sidewalk removal 2,294 sq ft, PCC Sidewalk 6 inch 4,610 sq ft, and 800 sq yds of PCC Pavement Patching. Project Completion date is September 30, 2022.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents