Similar Projects
Shepherdstown Middle School Roof Replacement
Bidding
Shepherdstown, WV 25443

South Jefferson Elementary School Roof Replacement
Bidding
Charles Town, WV 25414

Carter Hall and Van Meter Roof Replacement
Post-Bid
Morgantown, WV 26506

Roof Replacement
Post-Bid
$206,550 est. value
Martinsburg, WV 25401

Screening Information Request / Request for Offer HLG VOR Roof Replacement in Wellsburg, WV
Results
$140,000 to $240,000 est. value
Wellsburg, WV

Knutti Hall Roof and Foundation Improvements
Results
Shepherdstown, WV 25443

Blue Ridge Elementary School Roof Replacement
Bidding
Harpers Ferry, WV 25425

MBR and HSC South Roofing Projects
Post-Bid
Morgantown, WV 26506

Multiple Building Roof Replacement Project
Results
$239,000 est. value
Grafton, WV 26354

Gutter Repair
Bidding
New Martinsville, WV 26155

Roof Replacement on Specific Schools
Post-Bid
Lesage, WV 25537

HAFE - Gutter & Downspout Cleaning
Results
Harpers Ferry, WV

Roof Replacement at Marshall University
Bidding
Huntington, WV 25704

Simms School Elderly Apartment Roofing and Facade Historic Reconstruction and Restoration
Post-Bid
Huntington, WV

Mountainlair Roof C Replacement
Results
Morgantown, WV 26506

Last Updated 04/13/2021 12:40 PM
Project Title

Chelyan Salt Building Roof Exit 85

Physical Address View project details and contacts
City, State (County) Charleston, WV 25306   (Kanawha County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Fabric covered arch style roofing system for a salt storage building that is being constructed at the Chelyan Maintenance Facility located at Exit 85 along the West Virginia Turnpike. The structure will have inside clear dimensions of 60 ft by 120 ft (62’-4” by 122’-4” out to out) and will be constructed of reinforced concrete walls and slab. The building walls will project above the finished slab grade a minimum of 12' -0" to accommodate a 10' -0" salt stack height at the walls and a minimum 15'-0" center stack height. The roofing structure shall be designed to allow a minimum 39'-0" vertical clearance, 10' -0" each side of building centerline. The Authority will accept bids for alternate roofing structures; however, the alternate systems shall meet or exceed the minimum specifications included herein. Bids proposing dome style roofing systems will be rejected. The roofing system shall meet all standards for compliance with Local, State and Federal code guide lines. The Authority is also requesting that an enclosed door option be priced separately.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents