Similar Projects
Pre-Event Emergency Roadside Assistance Services
Bidding

Roadside Assistance Services
Post-Bid

100th Lane/Place Paving & Drainage
Post-Bid
$400,000 est. value
Fellsmere, FL 32948

Annual Street Resurfacing
Term Contract
Results
Less than $500,000 est. value
Vero Beach, FL 32960

Asphalt Repair
Results
Less than $600,000 est. value

Miscellaneous Construction
Results
Less than $1,000,000 est. value

Resurfacing
Results
Less than $7,369,743 est. value
FL

Asphalt Repairs
Results
Less than $300,000 est. value

Annual Asphalt Repaving and Resurfacing
Term Contract
Results
Vero Beach, FL 32960

Emergency Roadside Assistance Services (I-95)
Results

Pre-Event Emergency Roadside Assistance Services (ERA) (I-95)
Results

Asset Maintenance - Zone 2
Results
Less than $24,990,000 est. value

Fellsmere Road Base Enhancements
Results
Less than $2,000,000 est. value
Fellsmere, FL 32948

Roadway Construction Expansion at Sebastian Municipal Cemetery
Results
Less than $45,000 est. value
Sebastian, FL 32958

C.D.B.G. Phase 7 Paving and Drainage Project - 100th Lane and 100th Place
Results
$395,580 est. value
Fellsmere, FL 32948

Last Updated 04/24/2020 03:15 AM
Project Title

58th Avenue (from North of 57th Street to 85th Street) Full Depth Reclamation

Physical Address View project details and contacts
City, State (County) Vero Beach, FL 32960   (Indian River County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Full depth reclamation milling and resurfacing. FDOT SCOP funded project. The proposed improvements to 58th Avenue from north of 57th Street to 85th Street and 69th Street from Sta 11+84 to Sta 30+47 consist of reconstructing the roadway utilizing full depth reclamation, milling and resurfacing, widening the existing shoulders to 5-feet, structural asphalt, surface asphalt, drainage improvements, waterline directional bore, utility adjustments, signing, and pavement markings. This project is an F.D.O.T. Small County Outreach Program (SCOP) funded project, FM No. 436416-1-54-01. The link to the opening is: https://ircgov.zoom.us/j/99365281515?pwd=bmR1YTAxSTQzS3IxTkNScDl2NFpxQT09 If required, use password: 24539

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents