Similar Projects
Last Updated | 04/24/2020 03:15 AM |
Project Title | 58th Avenue (from North of 57th Street to 85th Street) Full Depth Reclamation |
Physical Address | View project details and contacts |
City, State (County) | Vero Beach, FL 32960 (Indian River County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $7,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Full depth reclamation milling and resurfacing. FDOT SCOP funded project. The proposed improvements to 58th Avenue from north of 57th Street to 85th Street and 69th Street from Sta 11+84 to Sta 30+47 consist of reconstructing the roadway utilizing full depth reclamation, milling and resurfacing, widening the existing shoulders to 5-feet, structural asphalt, surface asphalt, drainage improvements, waterline directional bore, utility adjustments, signing, and pavement markings. This project is an F.D.O.T. Small County Outreach Program (SCOP) funded project, FM No. 436416-1-54-01. The link to the opening is: https://ircgov.zoom.us/j/99365281515?pwd=bmR1YTAxSTQzS3IxTkNScDl2NFpxQT09 If required, use password: 24539 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |