Similar Projects
Bridge Creek Residential Development / Prattville
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Prattville, AL 36067

Waterway Village Pedestrian Bridge - City of Gulf Shore
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Gulf Shores, AL 36542

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

Smith Intermediate School Addition & Renovation - 2021 Bond - Cleburne Independent School
Addition, Infrastructure, Renovation
Design
$5,871,648 CJ est. value
Eufaula, AL 36027

City-Wide Road Repair, Resurfacing and Striping Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Fairhope, AL 36532

Final Design for Baldwin County Material Recovery Facility Building
New Construction, Infrastructure
Bidding
Bay Minette, AL 36507

Country Club Drive Water Main Replacement Phase A- Wedgewood Drive to Fairway
Infrastructure
Post-Bid
$300,000 CJ est. value
Daphne, AL 36526

Bon Secour Dredge Site Repairs
Infrastructure
Post-Bid
Bay Minette, AL

Metal Buildings for the Robertsdale Public Works Complex
New Construction, Infrastructure
Results
$933,109 CJ est. value
Robertsdale, AL 36567

Alpha Care Urgent Care / Fairhope
New Construction, Infrastructure - 3,291 SF
Results
$1,169,000 CJ est. value
Fairhope, AL 36532

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Kinderkids Daycare
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Daphne, AL 36526

Palmetto Ridge Townhouses
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Gulf Shores, AL 36542

Harbor Club Condominiums / Orange Beach
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Orange Beach, AL 36561

West 20th Avenue / West 1st St Intersection - City of Gulf Shores
Infrastructure
Conception
$700,000 CJ est. value
Gulf Shores, AL 36542

Last Updated 07/18/2023 10:06 AM
Project Title

Oneonta WTP Sludge Handling Facility

Physical Address View project details and contacts
City, State (County) Oneonta, AL 35121   (Blount County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All qualified bidders are invited to submit a Bid under sealed envelope to The Utilities Board of the City of Oneonta, Alabama for construction of a new sludge handling facility, and all other necessary appurtenances at Waterton Drive, Oneonta, Alabama, 35121. Direct questions in writing to Timothy R. Rylee, P.E., at the office of the Engineer, at tim@insiteengineering.org. It is the bidder's responsibility to ensure the email is received.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents