Similar Projects
2020 Sludge Hauling and Disposal - Transportation and Final Disposal of Sludge
Term Contract
Bidding
Hyannis, MA

2019 Septage Hauling Services
Term Contract
Post-Bid
Buzzards Bay, MA 02532

Operation of Mashpee Transfer Station
Post-Bid
$550,000 est. value
Mashpee, MA

Disposal of Surplus Equipment
Results
Orleans, MA 02653

Trash and Recycling Services at Various Town Buildings and Properties.
Results
Mashpee, MA

Waste and Single Stream Recycling Collection
Term Contract
Post-Bid
Wellfleet, MA

Trash Collection Services
Term Contract
Results
South Dennis, MA

Transportation of Municipal Solid Waste
Post-Bid
Barnstable, MA

2019 Refuse Collection and Disposal for the Barnstable School Department
Term Contract
Results
Hyannis, MA 02601

Disposal of Construction, Demolition, and other Wastes
Term Contract
Post-Bid
Barnstable, MA

Processing Recyclable Materials 2020
Post-Bid
Barnstable, MA

2 Heating Oil, Lp Gas And Poured-In-Place Surface
Post-Bid
Provincetown, MA 02657

Demilitarization (Demil) of Government Information Technology (IT) property in the Continental United States (CONUS)
Post-Bid

Dumpster Services
Term Contract
Post-Bid
$15,000 to $25,000 est. value
Buzzards Bay, MA 02532

Scrap Wood Hauling
Term Contract
Post-Bid
Provincetown, MA 02657

Last Updated 12/18/2018 07:30 AM
Project Title

Snow and Ice Removal Services at Hyannis Transportation Center

Physical Address View project details and contacts
City, State (County) Hyannis, MA   (Barnstable County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $37,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Snow Plowing Clear/scrape roads, parking areas and sidewalks of snow to the following standards: 1. All roads and parking areas, paved and unpaved, shall be cleared to within one foot of the edges of the existing areas. 2. All concrete walkways shall be completely cleared of snow and ice in the areas immediately surrounding the building and passenger loading areas. 3. All paved areas shall be free from any loose accumulation of snow. 4. All unpaved areas may be cleared by leaving the plow in a slightly raised position. 5. All intersections/corners shall be pushed back to their fullest extremes.
Details
Division 41 - Material Processing and Handling Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents