Similar Projects
Buck Street Drainage Improvements
Results
Less than $34,000 est. value
Pembroke, NH 03275

Soil Stabilization and Sealing
Post-Bid
Concord, NH 03302

Shaker Road Underdrain Installation
Infrastructure
Bidding
$318,973 est. value
Northfield, NH 03276

NBRC Grant/Sculptured Rocks Road Project
Results
Groton, NH

Quinttown Road Dual Culverts Replacement Project
Results
Orford, NH 03777

Indian Stream Restoration Project
Results
Concord, NH

Fire Station Driveway Drainage Improvements
Results
Hooksett, NH

Bay Hill Road Underdrain Installation
Infrastructure
Bidding
$210,983 est. value
Northfield, NH 03276

Alder Creek Drive Culvert Replacement
Infrastructure
Post-Bid
Concord, NH

Septic and Floor Drain Line Services
Results

Septic and Floor Drain Line Services
Results

Slip Lining
Results
Bow, NH

Major Road and Embankment Repairs and Reconstruction Stemming
Post-Bid
Orange, NH

Sculptured Rocks Road Culvert Project
Results
Groton, NH

Steam Loop System Decommissioning
Results
$50,000 est. value
Concord, NH

Reported 07/03/2021 12:00 AM
Project Title

Injecting Soil Stabilization Materials at Soil Covered Structures and in Roadway Bases

Physical Address View project details and contacts
City, State (County) Franklin, NH (Grafton, Merrimack Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

I-93 NB and SB over Hubbard Brook in Thornton, NH (bridges Thornton 152/073 and Thornton 153/074) at mile marker 93.2. The work will include overhead injection at joint locations shown to stabilize soils above the existing concrete box culvert to facilitate overhead concrete repairs (see Exhibit B 3 of 3). Injection holes shall be sufficiently spaced to assure that soils can bridge above the culvert during concrete repairs. NH 3A in Franklin, NH (GPS Coordinates 43.460586, -71.660695). The work shall consist of injection to provide soil densification to strengthen base and subbase materials under concrete pavement. Pavement profiles will be taken every 10 feet in a longitudinal direction on the edges and center of the work area.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents