Similar Projects
Window and Siding Replacement Phase 1
Renovation
Sub-Bidding
$100,000 CJ est. value
Prospect Heights, IL 60070

Doors, Locks and Door Accessories
Term Contract
Sub-Bidding
Chicago, IL 60604

Window Replacement at Resident Watchmen
Renovation
Post-Bid
$300,000 CJ est. value
Chicago, IL 60604

Charles R. Henderson Elementary School - Door Replacement
Alteration
Post-Bid
$200,000 est. value
Chicago, IL 60636

Windows Replacement
Alteration
Results
Inverness, IL 60067

Administration Windows/Lintels Replacement
Renovation
Results
$711,900 CJ est. value
Arlington Heights, IL 60004

Overhead Door Repair and Emergency Services
Renovation
Construction
$750,000 CJ est. value
Chicago, IL 60604

Prosser High School - New Cafeteria Doors - Only Prequalified Pool Various Trades PLA for Work
Renovation
Sub-Bidding
Chicago, IL 60639

Chicago Executive Airport Residential Sound Insulation Program
Alteration
Post-Bid
$3,400,000 est. value
Wheeling, IL 60090

Overhead, Automatic Door and Electronic Gate Repair and Preventative Maintenance
Alteration
Results
Glenview, IL

Replacement Windows
Renovation
Post-Bid
$90,000 CJ est. value
Blue Island, IL 60406

Streamwood Police Station Renovations
Alteration
Results
$40,000 est. value
Streamwood, IL 60107

Door Replacement in Chicago Heights
Alteration
Post-Bid
$8,000 to $22,000 est. value
Chicago Heights, IL

Haugan Doors
Renovation
Results
$44,567 CJ est. value
Chicago, IL 60625

Overhead and Garage Door Repair Services
Term Contract
Post-Bid
Chicago, IL 60604

Last Updated 10/16/2023 10:36 AM
Project Title

Installation of Fiberglass Doors with Woodgrain Look, Arched Frame and Hardware

Physical Address View project details and contacts
City, State (County) Northbrook, IL 60062   (Cook County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids
Project Status Construction start expected April 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $375,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 16, project is on hold. No definite date for the rebid. All questions related to this bid must be submitted no later than 10 a.m. on September 29, 2023 to Jack Tierney, Management Analyst at jack.tiereney@northbrook.il.us. Contact Information: For inquiries, interested parties should contact: Jack Tierney, Management Analyst, Village of Northbrook, Department of Public Works at jack.tierney@northbrook.il.us or 847-664-4128. Description: The Village of Northbrook is seeking proposals from qualified contractors for the installation of a new fiberglass door with a woodgrain look and arched door frame, incorporating a 1" insulated arched glass, simulated wood panels at the lower portion of the door and appropriate hardware at the Village of Northbrook Village Hall at 1225 Cedar Lane, Northbrook, Illinois. The scope of work includes the installation of a door with a continuous hinge, reuse of the existing ADA operator, creation of a new door frame, and replacement of the threshold. The door opening dimensions are approximately 74" by 100". 1. Removal of Existing Door and Frame: Carefully remove the existing door, frame, and threshold while minimizing any damage to the surrounding structure. 2. Installation of Fiberglass Door and Frame: Install a new fiberglass door with a woodgrain look and arched frame, featuring a 1" insulated arched glass and simulated wood panels at the lower portion, meeting the specified dimensions of approximately 74" by 100". Ensure proper alignment and level installation of the door within the new frame. 3. Continuous Hinge Installation: Install a continuous hinge to ensure smooth and durable door operation. 4. Hardware Installation: Install all necessary hardware components, including handles, locks, and any other specified items. 5. ADA Operator Reuse: Reuse the existing ADA operator for the newly installed door, ensuring it is integrated seamlessly and functions properly. 6. Threshold Replacement: Install a new threshold that complements the design of the new door and frame. 7. Finishing Touches: Ensure all components are properly aligned, adjusted, and functional. Apply any necessary finishing touches, such as sealing and painting. 8. Clean-Up: Clean the work area and dispose of any debris resulting from the installation.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents