Similar Projects
Beechurst and 1st St Intersection Improvements - City of Morgantown
Infrastructure
Conception
$350,000 CJ est. value
Morgantown, WV 26505

TAP Grant - Sidewalk-Bike Trail - City of Morgantown
Infrastructure
Conception
$350,000 CJ est. value
Morgantown, WV 26505

WV 7 OP Interchange (Auth AC Project) (Split Funded)
Infrastructure
Design
$20,000,000 CJ est. value
Osage, WV 26543

Richard Snyder Mem Br
Demolition, New Construction, Infrastructure
Design
$3,500,000 CJ est. value
Maidsville, WV 26541

PRT Fencing Project
Infrastructure
Bidding
$50,000 CJ est. value
Morgantown, WV 26505

PRT Guideway Concrete Repairs
Infrastructure
Bidding
$270,000 CJ est. value
Morgantown, WV 26505

Sledding Hill Slope Grading and Tow Rope Installation
Infrastructure
Post-Bid
WV

Paving Parking Lots 28 and ST5
Infrastructure
Post-Bid
$115,070 CJ est. value
Morgantown, WV 26505

West Virginia University Parking Lot 3 - Milling and Repaving
Infrastructure
Results
$58,320 CJ est. value
Morgantown, WV 26505

Lawless Road (WV Co. Rt. 46) Water Line Extension
Infrastructure
Results
$157,909 CJ est. value
Morgantown, WV 26501

WVU Hospital Master Campus Plan - Phase 3
Addition, Demolition, Renovation, Infrastructure
Conception
$155,000,000 CJ est. value
Morgantown, WV 26505

Van Voorhis Rd (Go Bond 4)
Infrastructure
Design
$5,000,000 CJ est. value
Morgantown, WV 26508

RFQ Engineering - 1st Street Relocation and Intersection Improvement Project
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Morgantown, WV 26505

WVU Evansdale Parking Lot Wall Repairs
Infrastructure
Results
$24,974 CJ est. value
Morgantown, WV 26505

Van Voorhis Rd
Infrastructure
Design
$8,500,000 CJ est. value
Morgantown, WV 26508

Last Updated 06/16/2023 09:14 AM
Project Title

GigaFactory

Physical Address View project details and contacts
City, State (County) Morgantown, WV 26505   (Monongalia County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a lithium-ion battery manufacturing plant. Square footage has not been announced. As of June 16, 2023, it is unknown if a building permit has been issued at this time. Information regarding an architect or contractor is currently unknown. Construction could begin in third quarter 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents