Similar Projects
High School Renovations
Renovation
Results
Kingston, NH

Hopkinton Middle High School Renovation
Renovation
Post-Bid
Contoocook, NH 03229

Coe-Brown Northwood Academy - Wiggin Hall
Renovation
Construction
$1,100,000 est. value
Northwood, NH

Technical Education Addition
Addition - 3,000 SF
Post-Bid
Swanzey, NH 03446

Construction Manager/General Contractor for Potential Renovation or New Build for Elementary and Secondary School
New Construction, Renovation
Results
Allenstown, NH 03275

Newmarket High School Annex Kitchenette
Results
Newmarket, NH 03857

Spaulding High School Field Storage Building
Results
Rochester, NH 03867

Newmarket High School Annex Renovation
Renovation
Results
Newmarket, NH 03857

Harold Martin School Additions and Renovations
Renovation, Addition
Post-Bid
Hopkinton, NH

Portsmouth Christian Academy Drainage & Site Improvements
Renovation
Post-Bid
Dover, NH 03820

Maple Street School Renovations
Renovation
Post-Bid
Hopkinton, NH

Glen Lake School Modular Classroom Addition
Addition
Results
Goffstown, NH 03045

Construction Management at Risk Services for Building Renovations Farmington School District with a Stipulated Sum
Renovation
Post-Bid
Farmington, NH 03835

Installation of Two Pre-K Restrooms in the Raymond High School
Results
Raymond, NH 03077

Last Updated 03/20/2020 11:51 AM
Project Title

Lebanon High School Lobby Bathroom Renovations

Physical Address View project details and contacts
City, State (County) Lebanon, NH 03766   (Grafton County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes renovation of a boys and girls bathroom in the lobby of the Lebanon High School. The project includes demolition of floor and wall finishes, lighting fixtures, partitions, toilets, urinals, sinks, lighting, etc. and salvaging of similar items for reuse; renovation and refinishing of floors, walls, doors and hardware, installation of new and salvaged plumbing fixtures, partitions, accessories and equipment.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents