Similar Projects
Publix - Summers Corner / Summerville (Ladson)
New Construction, Infrastructure - 51,454 SF
Conception
$12,000,000 CJ est. value
Ladson, SC 29485

Pump Station 104 Rehabilitation - Dorchester County
Renovation
Conception
$500,000 CJ est. value
Summerville, SC 29483

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Design
$18,000,000 CJ est. value
Summerville, SC 29485

Downtown Nexton Mixed-Use
New Construction, Infrastructure - 310,000 SF
Design
$100,000,000 CJ est. value
Summerville, SC 29483

RFP D/B - Summerville Fire-Rescue Station 6
New Construction, Infrastructure
Post-Bid
$3,094,921 CJ est. value
Summerville, SC 29485

Harris Teeter Fuel Center #355 / Summerville
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$800,000 CJ est. value
Summerville, SC 29485

Berkeley Dorchester Interconnect Division II
New Construction, Infrastructure
Results
Ridgeville, SC

Pump Station Rehabilitation Projects
Renovation
Results
$300,000 est. value
Saint George, SC

Widening - I-26 (187-194)
Infrastructure
Construction
$179,987,105 CJ est. value
Summerville, SC 29483

Wastewater Treatment Plant Expansion and Improvements
Infrastructure
Construction
$10,000,000 CJ est. value
Summerville, SC 29483

Coastal Crossroad Logistics Center Phase 1 and 2
New Construction, Infrastructure - 2,500,000 SF
Pending Verification
$200,000,000 CJ est. value
Summerville, SC 29483

BID Group Wood Processing Expansion
Addition, Demolition, Infrastructure
Pending Verification
$10,600,000 CJ est. value
Saint George, SC 29477

Sawmill Mixed Use Future Phases
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Summerville, SC 29483

Summerville Medical Center Patient Tower Expansion
Addition, Demolition, Infrastructure - 56,943 SF
Design
$66,800,000 CJ est. value
Summerville, SC 29485

Proposed Mitigation Plans for SC-91 (Berlin Myers Parkway) Phase 3
Infrastructure
Post-Bid
$200,000 CJ est. value
Summerville, SC 29483

Last Updated 07/12/2023 10:13 AM
Project Title

Pump Station 72 Replacement

Physical Address View project details and contacts
City, State (County) Saint George, SC 29477   (Dorchester County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $9,900,332 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 10, 2023, the project has been awarded. A timeline for construction has not been confirmed. Replace pump station with a new pump station consistent with the contract plans and specifications. Construction will include a cast in place wet well with splitter box, 30 force main piping, 42 influent gravity piping with polymer manholes, dual 600 kw generators, electrical and controls building, door control, and crane and monorail system. Last Day for Questions: Tuesday, June 6 @ 5:00PM Eastern Payment Bond: 100% of the total amount of the Contract. Performance Bond: 100% of the total amount of the Contract The County reserves the right to 1) reject any or all bids and any part of a bid; 2) waive informalities, technical defects, and minor irregularities in bids received; and 3) award the bid(s) received on the basis of individual items or groups of items or the entire list of items. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents