Similar Projects
Last Updated | 12/22/2021 05:51 AM |
Project Title | Orangewood Boulevard and Gateway Avenue Intersection Improvements |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL 32821 (Orange County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage, Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $3,910,270 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project involves converting the existing four-way stop controlled intersection to a fully signalized intersection at Orangewood Blvd. and Gateway Ave. in Orange County, Florida. Construction includes realignment of the intersection, both horizontally and vertically, involving construction of both the roadway and the storm sewer system. The project will also include replacement of existing sidewalk along the northwest side of Orangewood Boulevard. In addition, this project also includes the construction of raised median with additional storage for left-turning traffic in the median on Orangewood Boulevard and Eastbound Gateway Avenue. Proposed intersection improvements include reconstruction of the existing asphalt pavement, new pavement markings with special emphasis crosswalks and curb ramps. Drainage improvements include concrete pipe culvert, ditch bottom inlets, manholes, and concrete endwalls. Signalization work involves converting the existing four-way stop controlled intersection to a fully signalized intersection with mast arms and interconnect. Pedestrian improvements include construction of new curb ramps at the intersection and replacement of existing sidewalk with 4” thick concrete sidewalk where necessary. All pedestrian features are to adhere to current ADA standards. Utility coordination is required. The construction of the proposed utility improvements will include installation of approximately 35 linear feet of 16-inch diameter D.I. potable water, 685 linear feet of 12- inch diameter D.I. potable water main, 190 linear feet of 8-inch diameter D.I. potable water, 10 linear feet of 2-inch diameter PVC potable water and furnish and installing approximately 25 linear feet of 12-inch diameter PVC force main for Orange County Utilities (OCU). |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |