Similar Projects
Wells 3 and 4 Water Treatment Plant - General Bids
Bidding
$8,400,000 est. value
Medfield, MA 02052

Well 3A Submersible Pump and Motor Replacement
Bidding
Less than $25,000 est. value
Needham, MA

Emergency Repair of Submersible Motor at Well 6
Post-Bid
Foxborough, MA 02035

Cleaning, Redevelopment and Chemical Treatment of Gravel Packed Wells
Post-Bid
Less than $82,000 est. value
Walpole, MA

Muddy Pond Replacement Wells and Pump Station
Results
$3,000,000 est. value
Stoughton, MA

Cleaning and Redevelopment of the Town's Seven Wells
Term Contract
Results
Stoughton, MA 02072

Backwash Pump VFD Project
Post-Bid
Walpole, MA 02081

Well #3A Submersible Motor Replacement
Results
Less than $18,000 est. value
Needham, MA

Municipal Drinking Water Well Cleaning and Rehabilitation
Term Contract
Post-Bid
Less than $200,000 est. value
Canton, MA

Installation of two New Drinking Water Wells
Results
Less than $700,000 est. value
Plainville, MA

Public Water Drinking Well Installation
Results
Plainville, MA

Wet Well Cleaning
Term Contract
Results
Stoughton, MA

Oak Street Replacement Wells 7R, 9R, and 10R
Results
Less than $815,000 est. value
Foxborough, MA 02035

Well 2 Redevelopment and Inspection
Results
Less than $30,000 est. value
Needham, MA

Drinking Water Supply Well Rehabilitation
Results
$45,000 est. value
Bellingham, MA

Last Updated 04/21/2021 08:51 AM
Project Title

Wells 3 and 4 Water Treatment Plant - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Medfield, MA 02052   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. Work under this Contract includes, but is not necessarily limited to, the construction of the Wells 3 & 4 Water Treatment Plant and modifications to Well Stations 3 and 4. The Wells 3 & 4 WTP will include: a pre-fabricated metal building system; chemical storage tanks and chemical feed systems; an iron and manganese filtration system; air scour blower, and associated structural, architectural, process piping, instrumentation and controls, plumbing, HVAC, and electrical work to provide a fully functional water treatment plant as specified in the Contract Documents. Modifications to Well Station 3 include demolition of the existing vertical turbine pump, abandonment of well 3, and the installation of a new submersible well pump 3A. Modifications to Well Stations 3 and 4 include selective demolition of chemical feed systems; instrumentation and controls; and replacement of process mechanical equipment, piping, and appurtenances. Additional work includes miscellaneous site work, yard piping, and appurtenances

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents