Similar Projects
Repairs of Access Road Near Camptonville - County of Yuba
Renovation, Infrastructure, Alteration
Conception
$600,000 est. value
Camptonville, CA

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Howard Road Erosion Control
Infrastructure
Bidding
Stockton, CA 95214

Flume 45 Abutment Replacement
Infrastructure
Bidding
$2,406,366 est. value
Pollock Pines, CA 95726

Levee Maintenance Project
Infrastructure
Post-Bid
Stockton, CA 95214

Repair Failing Slope
Infrastructure
Post-Bid
$275,400 est. value
CA

County Roadway Drainage Improvement Project
Infrastructure
Results
CA

Upper Mormon Slough Critical Erosion Repair
Infrastructure
Results
$5,387,900 to $6,136,214 est. value
Escalon, CA 95320

Replace Drainpipes at the Cliff Houise
Infrastructure
Design
$100,000 est. value
Mill Valley, CA

MLK Recreation Center Moisture Intrusion
Infrastructure, Alteration
Bidding
$916,000 est. value
San Diego, CA 92114

CA FTNP REDW 100(1) Cushing Creek Box Culvert
Infrastructure
Post-Bid
$600,000 to $900,000 est. value
Crescent City, CA 95531

Roadway Excavation, HMA (Type A), Culvert Work and RSP
Infrastructure
Results
$4,860,000 est. value
CA

Removal and Reconstruction of a 30-foot Section of the Arcade Creek Floodwall
Infrastructure
Bidding
$800,000 est. value
Sacramento, CA

SB Minor B - Drainage Improvement
Infrastructure
Post-Bid
$295,143 est. value
CA

Last Updated 06/29/2022 11:13 AM
Project Title

NCAO Phase II Channel Rehabilitation Review

Physical Address View project details and contacts
City, State (County) Sacramento, CA   (Fresno County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide services including assembling and coordinating an expert panel with expertise in stream restoration design, construction, and/or monitoring to conduct a thorough review of the TRRP’s channel rehabilitation, gravel augmentation, site revegetation activities, as well as its flow management as it relates to these activities.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents