Similar Projects
West Air Cargo Apron Reconstruction
Infrastructure
Conception
$8,000,000 est. value
Phoenix, AZ

Attessa Motorsports Complex Master Plan
New Construction, Alteration
Conception
Casa Grande, AZ 85193

Phoenix Goodyear Airport Construct New Apron and Taxiway Connector
Infrastructure
Design
$7,102,620 est. value
Goodyear, AZ 85338

Rehabilitate Runway 01/19 Rehabilitate Taxiway Connectors A1, A2, & A3
Alteration
Post-Bid
Parker, AZ

General Apron Rehabilitation
Alteration
Post-Bid
$2,000,000 to $2,500,000 est. value
Yuma, AZ

Taxiway C Rehabilitation
Results
$775,000 to $975,000 est. value
Chandler, AZ

162nd Wing - Apron Shoulder Repair
Results
Tucson, AZ 85706

Construct/Realign-Taxiways D3,D4,D7,D8 - CP1038 - City of Mesa
Alteration
Conception
$4,115,345 est. value
Mesa, AZ 85215

Rehabilitate and Reconstruct Taxiway
Infrastructure
Post-Bid
$637,300 est. value
Lake Havasu City, AZ 86404

Apron and Taxiway J Rehabilitation Project
Results
Sierra Vista, AZ

Falcon Field Airport Taxiway C Run-Up Area - CP0691 - City of Mesa
Infrastructure
Conception
$1,720,720 est. value
Mesa, AZ 85215

Improvements to Chinle Municipal Airport Reconstruct Runway 18/36 Chinle
Infrastructure
Post-Bid
$4,500,000 est. value
Chinle, AZ 86503

Improvements to Show Low Regional Airport Reconstruct South Apron
Results
$900,000 est. value
Show Low, AZ 85901

Falcon Field Airport Design/Build Taxiway - Delta 9 - CP0996 - City Of Mesa
Renovation, Infrastructure
Conception
$521,429 est. value
Mesa, AZ 85215

Runway 8-26 Rehabilitation
Infrastructure
Post-Bid
$200,000 est. value
Safford, AZ 85546

Reported 07/15/2022 09:27 AM
Project Title

I-11 Airway Avenue - Prospector Street to Rancho Santa Fe Parkway - City of Kingman

Physical Address View project details and contacts
City, State (County) Kingman, AZ 86409   (Mohave County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value Less than $5,655,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving and outdoor lighting for a civil project in Kingman, Arizona. Conceptual plans call for outdoor lighting for a road / highway; for site work for a road / highway; and for paving for a road / highway. This project will extend Airway Avenue from east of Prospector Street to Rancho Santa Fe Parkway, providing connection to the proposed traffic interchange and access to the east Kingman area. This project is in included in the City of Kingman FY 2022-2023 Capital Improvement Plan (CIP). As of July 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents