Similar Projects
West Pasco Water Treatment Plant Improvements: Phase 1
New Construction
Results
$8,382,834 est. value
Pasco, WA 99301

Water System Improvements
Renovation
Bidding
$1,500,000 est. value
Issaquah, WA 98027

Fmd Burien Court House Retrofit
Renovation
Design
$600,000 est. value
WA

Clark Regional Wastewater District - Phase 5A Project: Package 2 - Salmon Creek Treatment Plant Columbia River Effluent Pipeline
Renovation
Bidding
$12,500,000 to $15,500,000 est. value
Vancouver, WA 98685

Downtown Wells Treatment Facility Upgrade
New Construction
Results
$950,000 to $1,050,000 est. value
Yelm, WA

Clark Regional Wastewater District - 2022 Salmon Creek Treatment Plant Restoration and Repair Projects
New Construction, Renovation
Bidding
$2,400,000 to $2,800,000 est. value
Vancouver, WA 98685

Thickening and Dewatering Polymer Services
Renovation
Post-Bid
University Place, WA 98467

Water Filtration Plant Phase 2
New Construction
Results
Everett, WA

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Testing of Backflow Preventers
Renovation
Post-Bid
WA

Reinig Road Culvert Replacement on Brockway Creek
New Construction
Design
$500,000 est. value
WA

Water Station 7 Sodium Hypochlorite and Fluoridation Systems
New Construction
Results
$630,000 est. value
Vancouver, WA 98684

Reported 02/24/2022 12:00 AM
Project Title

Big Gulch WWTF Dewatering System Replacement

Physical Address View project details and contacts
City, State (County) Mukilteo, WA 98275   (Snohomish County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $675,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes removal and disposal of the existing biosolids dewatering belt press equipment and support frames and providing new support frames, receiving and installing the owner furnished equipment package (rotary dewatering press, flocculator, conveyors, polymer system and control panel), and providing all civil, structural, mechanical, electrical, controls, and incidental work for a complete and operable installation.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents