Similar Projects
Construction of the Pleasant Grove City - Cemetery Expansion Project
Bidding
Pleasant Grove, UT

Cottonwood Improvement District - Rehab 2021 Sewer Pipeline
Bidding
Sandy, UT

Storm Drain Video Project to Camera Storm Drain Pipes and Structures
Post-Bid
Taylorsville, UT 84129

1700 South Storm Drain, from 2100 E to Emigration Creek
Post-Bid
Salt Lake City, UT 84115

Storm Drain Improvements in Canyon Near Lacey Way
Results
$500,000 to $600,000 est. value
North Salt Lake, UT

2019 Public Works Project
Results
Hyrum, UT 84319

Installation of A Storm Drain Line Extension On 200 East
Construction
Enterprise, UT 84725

2021 Provo City Franklin Park Storm Drain - Phase 1 Project
Bidding
Provo, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Williams Building - Storm Water Conservation Garden
Results
$868,336 est. value
Salt Lake City, UT 84108

Construction of the Cedar Heights Stormwater Improvements
Post-Bid
Kanab, UT 84741

Utah Caldwell Wash Storm Drain Improvements
Results
Washington, UT 84780

Storm Drain Along Uprr Union Avenue to Main Street
Post-Bid
North Salt Lake, UT 84054

Hillside Lane Storm Drain
Results
$150,000 to $200,000 est. value
Salt Lake City, UT 84106

2550 South Phase 3 Improvement Project
Post-Bid
West Haven, UT 84401

Last Updated 11/10/2020 11:35 AM
Project Title

Mountain View Storm Drain and Trail Rebuild Project

Physical Address View project details and contacts
City, State (County) Farr West, UT 84404   (Weber County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $101,479
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of removing and replacing 873 l.f. of 24" RCP storm drain, 1 ea. 4` manhole, and removing 1,140 s.y. of 10 foot wide asphalt trail and reconstructing new in the same location. Work shall be completed by November 26, 2020, weather pending. Should weather not permit asphalt placement, this portion can be completed in Spring 2021.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents