Similar Projects
Carpet and Bar Floor Install
Alteration
Bidding
Estes Park, CO 80517

Summit Hall 1St Floor Flooring Replacement
Alteration
Bidding
Fort Collins, CO

Hardwood Synthetic Sports Flooring
Post-Bid

Hardwood Synthetic Sports Flooring
Post-Bid

CTCF Kitchen Floor Replacement
Results
$750,000 est. value
Colorado Springs, CO

Flooring Chapman Hill Pavilion and Rink Area
Results
Durango, CO

ADA Restrooms at Historic City Hall - Flooring
Alteration
Bidding
Brighton, CO 80601

Cardio Equipment and Flooring
Post-Bid
Firestone, CO

Non Slip Epoxy Floor Coating
Results
Berthoud, CO 80513

Englewood Library Carpet Replacement
Alteration
Bidding
Englewood, CO 80110

Michener Plaza Waterproofing
Post-Bid
Less than $100,000 est. value
Greeley, CO 80639

Annual Maintenance - Flooring Replacement
Term Contract
Results
Loveland, Milliken, Windsor, CO 80538

OAAA, 2010, BAFB Building 1500 Restroom Floor Tile
Post-Bid
Aurora, CO 80112

Carpet Replacement for the Detention Facility and the Aurora Motor Vehicle
Term Contract
Results
Aurora, Brighton, CO 80601

Anti-Fatigue Pharmacy Floornig
Post-Bid
Aurora, CO 80011

Reported 11/24/2021 12:00 AM
Project Title

CSPD Police Operations Center Flooring Refresh Project

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80903   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: A. The project scope for the 1st floor includes the removal of old floor covering and the installation of new Luxury Vinyl Tile (LVT) floor covering for 1st floor main corridors and select office/conference rooms and open office areas. The project also consists of the removal of the existing black cove base and beige wall corner guards and the installation of new cove base and corner guards for all wall corners. B. The project scope for the 4th floor includes the removal of old floor covering and the installation of new Luxury Vinyl Tile (LVT) floor covering in the main corridors and select storage/conference rooms and open office areas throughout the entire floor level. The project also consists of the removal of the existing beige cove base and beige wall corner guards and the installation of new cove base and corner guards for all wall corners. C. The project scope for the 4th floor also includes the removal of old floor covering and cove base and the installation of new cloth floor covering and cove base in all office and select conference rooms throughout the entire floor level. D. Total project bid to include the pricing for labor, tools, equipment, materials and services to paint all interior office area wall surfaces and corridors, door and widow trims, and accents as highlighted on Attachments 1 and 2. E. Pricing is inclusive of supply and installation, permit and inspections if required, removal of demolition debris/material from site to an approved dumping facility pedestrian traffic control, and clean-up of debris. F. All furniture and accessory moving will be completed by the contractor in coordination with a schedule of room/area priorities as agreed upon by the Contractor and Owner. G. Pricing will include furniture and accessory moving required to remove old and install new floor covering, cove base and wall corner guards throughout the designated 1st and 4th floor levels. H. Wall Hangings and personal memorabilia will be moved by the Owner/Office Room occupants.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents