Similar Projects
Ball 308 Engineering Research Lab Modifications - GC
Renovation
Bidding
$615,000 CJ est. value
Lowell, MA 01854

Repair Sustain HVAC RM 169 and 264 Building 1607
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Lincoln, MA 01773

PYNE School Chiller Project
Renovation
Sub-Bidding
$150,000 CJ est. value
Lowell, MA 01852

HVAC and Mechanical Products
Term Contract
Post-Bid

Melrose Armory Heating Replacement
Post-Bid
$2,129,464 est. value
Melrose, MA 02176

Scheduled and Emergency HVAC System Repairs and Improvements at Various Locations
Results
$127,050 est. value

Randall Memorial Library Roof / HVAC Replacement
Results
$100,000 est. value
Stow, MA 01775

Existing Classroom Unit Ventilators and Install New Unit Ventilators
Renovation
Sub-Bidding
$550,000 CJ est. value
Lowell, MA 01851

Melrose Armory Heating Replacement - Sub-Bids
Post-Bid
$2,129,464 est. value
Hanscom A F B, MA

Pinanski Emergency Generator - Filed Sub Bids
Results
$550,000 est. value
Lowell, MA 01854

Ball 308 Engineering Research Lab Modifications - Sub
Renovation
Sub-Bidding
$615,000 CJ est. value
Lowell, MA 01854

Removal and Replacement of Classroom Unit Ventilators at Hubert School
Post-Bid
Hudson, MA 01749

Plumbing Shop Exhaust Updates
Results
$35,000 est. value
Tyngsborough, MA 01879

Heat Pump Improvements at the Stow Highway Department
Post-Bid
Stow, MA

Energy Recovery Unit Replacements at Hudson High School
Results
$700,000 est. value
Hudson, MA 01749

Last Updated 09/12/2022 09:03 AM
Project Title

Installation of Two Boilers at the Department of Public Works

Physical Address View project details and contacts
City, State (County) East Watertown, MA 02472   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $145,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of Two Boilers at the Department of Public Works Questions are due by 8/26/22 @ 5:00 P.M. & will be issued via addendum to all who have requested the bid documents via emailing the Purchasing Department. Please contact Purchasing@Watertown-ma.gov with any questions. Thank you. The City of Watertown will supply the Two (2) new Boilers. The work consists of the installation of Two (2) Patterson-Kelley ST-1500 P-K Storm Hot Water Condensing Boilers and two (2) associated Patterson-Kelley circulation pumps. The Scope of demolition and removal work is indicated on the drawings. The Scope of alterations work is indicated on the drawings. City of Watertown will supply and install Two (2) new 3/4-HP motors for existing Pumps P-5&6. DPW intends to continue to occupy adjacent portions of the existing building during the entire construction period. Cooperation with the DPW department to minimize conflict and to facilitate DPW operations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents