Similar Projects
Intersection Safety Improvement - US070
Infrastructure
Conception
$750,000 CJ est. value
Lone Grove, OK 73443

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Bridge and Approaches - US 77
Infrastructure
Design
$1,247,400 CJ est. value
Ardmore, OK 73401

Amtrak ADA Station Renovation - Ardmore
Infrastructure
Bidding
$250,000 CJ est. value
Ardmore, OK 73401

12th Avenue NW Improvements - Phase 1A
Infrastructure
Bidding
$20,000 CJ est. value
Ardmore, OK 73401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Hangar Storm Sewer Improvements
Infrastructure
Post-Bid
$420,000 CJ est. value
Ardmore, OK 73401

Resurface (Asphalt) - SH-199
Infrastructure
Results
$4,536,546 CJ est. value
Ardmore, OK 73401

8th Street NW Roadway & Storm Sewer Improvements
Infrastructure
Results
$2,588,500 CJ est. value
Ardmore, OK 73401

Grade, Drain and Surface - SH 53A
Infrastructure
Design
$1,110,183 CJ est. value
Springer, OK 73458

Safety Improvements (Delineation and Wrong Way Counter Measures) I-35
Infrastructure
Bidding
$850,000 CJ est. value
Ardmore, OK 73401

Ardmore Downtown Executive Airport (ADEA) Hangar Infrastructure Project
Infrastructure, Renovation
Post-Bid
$640,000 CJ est. value
Ardmore, OK 73401

Ardmore Industrial Airpark Waterline Expansion and Rehabilitation Phase 1.
Infrastructure
Results
$2,374,826 CJ est. value
Ardmore, OK 73401

Bridge and Approaches - SH 199
Infrastructure
Design
$2,300,000 CJ est. value
Ardmore, OK 73401

Turnkey Construction of a Metal Building for Hennepin Fire Department
New Construction, Infrastructure
Bidding
$125,000 CJ est. value
Hennepin, OK 73444

Last Updated 10/03/2023 12:37 PM
Project Title

2022 CDBG Wastewater Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Healdton, OK 73438   (Carter County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $735,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Quantity/Unit/Description 1.00 L.S. Electrical System Replacements with SCADA System 1.00 L.S. New Electrical Building 1.00 L.S. Furnish and Install New Piping and Interconnections from Raw Sewage Pump Station to Existing Piping 1.00 L.S. Furnish and Install New Raw Sewage Lift Pumps with Slide Rail System with Valve Box, Gate valves and check valves 1.00 L.S. Furnish and Install New Return Sludge, Scum and Sludge Pump Station with Piping Interconnections and Interface 1.00 L.S. Generator and Automatic Transfer Switch All bids must include assurances that the following provisions will be complied with: 1. Federal Labor Standards Provisions , US Department of Labor, 29 CFR 5; Subpart A -Davis-Bacon Act; Subpart B - Fringe Benefit Provision. 2. Section 3 Final Rule became effective on November 30, 2020. It is codified at 24 CFR part 75. The regulation simplifies the Section 3requirements and establishes that Section 3 requirements apply to housing rehabilitation, housing construction, and other public construction projects assisted under HUD programs that provide housing and community development financial assistance when the total amount of HUD assistance to the project exceeds a minimum funding threshold. The regulation also improves alignment with current business practices by requiring the reporting of labor hours rather than new hires. The Benchmark Notice establishes the current numeric goals for compliance with Section 3 requirements. 3. Section 109 of the Housing and Community Development Act of 1974, which assures that no person shall, on the grounds of race, color, natural origin, or sex, be excluded from participation in, be denied the benefits of or be subjected to discrimination. 4. Non-Segregated Facilities , Certification that assures the bidder does not maintain or provide any segregated facilities. 5. Executive Order 11246 , EEO provisions require affirmative action and prohibits federal contractors from discriminating on the basis of race, color, religion, sex, sexual orientation, gender identity, or national origin. 6. Minority Business Enterprise and Women Business Enterprise provisions which encourage minority-owned business and women-owned businesses to bid on the project. 7. Circular 570 -Assurances that surety companies executing bonds appear on the Treasury Department's list and are authorized to transact business in the State where the project is located. 8. Online Registration - Entities must be Active in website with no exclusions in order to receive a federally assisted contract. American Iron and Steel provisions also apply to projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the Safe Drinking Water Act, Section 1452(a)(4), requiring that all iron and steel products used for a project for the construction, alteration, maintenance, or repair of a public water system are produced in the United States. Contractor must obtain plans and specifications from the office of the Engineer and be registered on the Engineer's bid list to be recognized as an eligible bidder for this project. Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the office designated in the solicitation by the time specified in the solicitation. Any proposal, modification, or revision received at the office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered. No facsimile, telephone, or electronic copies will be accepted. The Owner reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning reason therefore, and to make the award in the best interests of the owner. Bid must be awarded to the lowest, responsive, and responsible bidder pursuant to the Oklahoma State Competitive Bidding Act of 1974 as amended.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents