Similar Projects
Stream Clearing at Meadowlands
Term Contract
Bidding
Lexington, NC

D-10300 Sandy Run Pay As Cut Timber FY 21
Term Contract
Bidding
Camp Lejeune, NC

Waste Management Services
Term Contract
Post-Bid
Salisbury, NC 28146

Yard Waste Collection and Disposal
Post-Bid
Lake Waccamaw, NC 28450

Schenck JCC Waste & Recycle Multi-Year
Results
$100,000 to $250,000 est. value
Pisgah Forest, NC 28768

Disaster Debris Removal Services
Results
Morehead City, NC 28557

On-Call Snow And Ice Removal With Single Axle Trucks In Iredell Co
Infrastructure
Bidding
NC

Timber Disposal Bids for a Transportation Infrastructure Generating Economic Recovery (TIGER) Project
Post-Bid
Chadbourn, NC 28431

Comprehensive Disaster Recovery Services
Term Contract
Results
Less than $25,000 est. value
Manteo, NC 27954

Operate Refuse Transfer Station, Collection/Disposal of Refuse and Recycling
Term Contract
Bidding
Cherry Point, NC 28533

Phase II Debris Removal and Hazardous Tree Abatement Contractor
Term Contract
Post-Bid
Cape Carteret, NC 28584

White Goods and Scrap Metal Collection
Results
Less than $81,695 est. value
Bolivia, NC

Garbage Pickup Services for FY 2020/2021
Term Contract
Post-Bid
Kingstown, NC

Wheat Swamp Stream Debris Removal
Results
Kinston, NC 28504

Stream Clearing at Old Highway 109
Post-Bid
Lexington, NC 27293

Reported 09/29/2021 12:00 AM
Project Title

Snow and Ice Removal with Multi-Axle Trucks

Physical Address View project details and contacts
City, State (County) NC   (Alexander County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1 SP Total Outfitting Fee—for snow removal equipment for each multi-axle truck 5 EA 2 SP Outfitting Fee—for snow removal equipment for each multi-axle truck (50% of item 1 Unit Price Bid 1st Year) 5 EA 50% of item 1 unit price Bid. TO BE CALCULATED BY NCDOT TO BE CALCULATED BY NCDOT 3 SP Outfitting Fee—for snow removal equipment for each multi-axle truck (30% of item 1 Unit Price Bid 3rd Year) 5 EA 30% of item 1 unit price Bid. TO BE CALCULATED BY NCDOT TO BE CALCULATED BY NCDOT 4 SP Outfitting Fee—for snow removal equipment for each multi-axle truck (20% of item 1 Unit Price Bid 5th Year) 5 EA 20% of item 1 unit price Bid. TO BE CALCULATED BY NCDOT TO BE CALCULATED BY NCDOT 5 SP Outfitting Fee – for Global Positioning System (GPS) 6 EA 6 SP Global Positing System Monitoring Subscription 1st Year 2020-2021 6 EA 7 SP Global Positing System Monitoring Subscription 2nd Year 2021-2022 6 EA 8 SP Global Positing System Monitoring Subscription 3rd Year 2022-2023 6 EA 9 SP Global Positing System Monitoring Subscription 4th Year 2023-2024 6 EA 10 SP Global Positing System Monitoring Subscription 5th Year 2024-2025 6 EA 11 SP Truck w/Driver 1st Year 2020-2021 500 HR 110.00 55,000.00 12 SP Truck w/Driver 2nd Year 2021-2022 500 HR TBD by CPI Oct. 2022 TBD 13 SP Truck w/Driver 3rd Year 2022-2023 500 HR TBD by CPI Oct. 2023 TBD 14 SP Truck w/Driver 4th Year 2023-2024 500 HR TBD by CPI Oct. 2024 TBD 15 SP Truck w/Driver 5th Year 2024-2025 500 HR TBD by CPI Oct. 2025 TBD 16 SP Hourly Training Contractor’s Forces 200 HR 25.00 5,000.00

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents