Similar Projects
DODEA Americas UPS Upgrade and Warranty Services
Post-Bid

Electrical Contractor Services Hourly
Term Contract
Post-Bid
Less than $35,000 est. value
Viera, FL

Multiple Award Construction Blanket Purchase Agreement for Electrical Disciplines
Results
Less than $5,000,000 est. value
Cape Canaveral, FL 32899

Welcome Center Solar Power Improvements
Results
Titusville, FL 32976

Replace Generators, South Substation (FAC 1395)
Post-Bid
$5,000,000 to $10,000,000 est. value
Patrick AFB, FL 32925

Generator Inspection and Maintenance for Public Works Department
Term Contract
Results
Titusville, FL

Fans Lighting Hanger 750
Post-Bid
Patrick AFB, FL 32925

Development of Low Voltage/Extended Runtime Signalized Intersection Using Backup Power
Results

Replace Generators, South Substation, Facility 1395 Patrick Afb, Fl (Sxht 17-1005)
Post-Bid
$5,000,000 to $10,000,000 est. value
Patrick AFB, FL 32925

Electrical, Life Safety and Lightning Protection Systems Maintenance, Repair, Install ,Replace,Testing
Term Contract
Results

High Voltage Transformer Repair
Post-Bid
Patrick AFB, FL

Generators
Results
$47,225 est. value
FL

Uninterruptible Power Supply (UPS) Systems Replacement
Post-Bid
$130,000 est. value
Melbourne, FL 32934

Pre-Event Emergency Rest Area Generator Installation
Results
Less than $100,000 est. value

Lift Station RTU Panels
Post-Bid
Cocoa, FL

Last Updated 08/01/2019 10:05 AM
Project Title

Replace Substation 1100 Switchgear

Physical Address View project details and contacts
City, State (County) Cape Canaveral, FL 32899   (Brevard County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The work includes replacement of existing service entrance switchgear, with new switchgear with main-tie-main configuration and auto-transfer scheme. Switchgear main-tie-main devices shall be electrically operated and metered, and be connected to the existing KCCS for remote monitoring and control. Generators shall be provided to temporary back feed the entire Logistics facility during the replacement of the switchgear. A complete power system (short circuit and coordination) and hazard analysis (arc flash) for the entire Logistics facility is also part of the scope of this work. Include also all other incidental related work.
Details
Division 26 - Electrical, Medium-Voltage Switchgear, Low-Voltage Switchgear.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents