Similar Projects
Bathroom Exhaust System. Install New Exhaust Systems in Bathrooms at Standish/Olmsted Complex
Bidding
Less than $46,800 est. value
Plymouth, MA

Construction of a Concrete Equalization Basin, Odor Control Facility, Denitrification Filters, and Development of a Groundwater Well - Filed Sub-Bid
Bidding
$8,000,000 est. value
Wareham, MA

WWTP HVAC Upgrades - Sub-Bid
Sub-Bidding
$3,000,000 est. value
Hull, MA

Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

East Campus Commons Air Handler
Post-Bid
Bridgewater, MA 02325

Pump Station Duct Cleaning and Repairs
Results
$468,000 est. value
Hingham, Quincy, MA 02043

Heating and Venting Services
Results
Less than $150,000 est. value
Brockton, MA

Remove and Replace HVAC Rooftop Unit (RTU)
Bidding
Brockton, MA 02301

AHU Control Upgrades
Post-Bid
Less than $25,000 est. value
Middleborough, MA

FY2021 Refrigeration and Air Conditioning Services
Results
Less than $150,000 est. value
Brockton, MA 02301

WWTP HVAC Upgrades - General Bid
Bidding
$3,000,000 est. value
Hull, MA

Residential Weatherization Contractors
Post-Bid
Wareham, MA

Rondileau Student Union B-Building Air Conditioning Upgrades - Filed Sub-Bids
Results
Less than $171,000 est. value
Bridgewater, MA 02325

On-Call HVAC Systems Repair and Maintenance
Bidding
Plymouth, MA

On-Call Tradesperson and Repair Services
Post-Bid
Plymouth, MA

Reported 04/29/2021 12:00 AM
Project Title

Hood and Duct Work

Physical Address View project details and contacts
City, State (County) Hanson, MA   (Plymouth County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Take down existing hood and duct work. Furnish and install 12' X 54" X low profile make-up air hood with Filters and lights. One 16 GA welded duct line from hood to roof. Duct work wrapped with 0" clearance firemaster duct wrap. New upblast exhaust fan mounted on curb on roof. Unheated make-up air fan and duct work. Stainless steel wall panel rear of hood. Add additional 4' onto line-up.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents