Similar Projects
Corner Repair FY21-22 - Citywide ADA 3
Infrastructure
Results

SLBE - Sidewalk Improvements - Belleview West 26th to West 27th, Southwest Boulevard (East Side) West 27th to West 28th Street
Infrastructure
Results
Kansas City, MO

Sidewalk Improvements Euclid Avenue East 53rd to East 54th Street
Infrastructure
Results
Kansas City, MO

Sidewalks FY21-22 – CWA Missouri River South 2
Infrastructure
Results
Kansas City, MO

2022 Concrete Flatwork Replacement Project
Infrastructure
Results
Liberty, MO

Sidewalk Improvements - High Ct - E 96th Ter to Dead End (Cul-de-Sac)
Infrastructure
Results
Kansas City, MO 64134

Single Terminal And Parking Final Cleaning
New Construction
Post-Bid
Kansas City, MO

2021 Curb, Gutter, Sidewalk and Trail Program- Phase 1
Results
Gladstone, MO

Concrete Flatwork
Infrastructure, Alteration
Results
Kansas City, MO

2022 Curb, Gutter and Sidewalk Program Phase 1 Project
Infrastructure
Post-Bid
$300,000 est. value
Gladstone, MO

Diamond Crest Park Sidewalk
Infrastructure
Post-Bid
Smithville, MO 64089

Construction of 16th Avenue and Clay Street Parking Lots
Infrastructure
Post-Bid
$200,000 est. value
North Kansas City, MO 64116

Sidewalks FY22-23 - CWA Citywide 1
Infrastructure
Results
Kansas City, MO

23Rd & Swift Apartments
New Construction - 98,621 SF
Post-Bid
North Kansas City, MO 64116

Gladstone Downtown District Parking, Lighting and Street Rehabilitation
Infrastructure
Results
Gladstone, MO

Reported 06/10/2022 12:00 AM
Project Title

Excelsior Springs Community Center - Outdoor Aquatic

Physical Address View project details and contacts
City, State (County) Excelsior Springs, MO 64024   (Clay County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Sidewalks/Parking Lot, Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $5,300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a new outdoor aquatics facility and associated infrastructure for the existing Excelsior Springs Community Center including 8 lane competition swimming pool and deck, shade and storage open-air shelter structures, seasonal air structure over the outdoor pool, parking lot expansion, and stormwater improvements on site and south of Wornall Rd. in the Century Park Pond.

Details

Clubhouse/Social Club, New Construction, Clubhouse/Social Club, 1,330 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents