Similar Projects
Pleasant Street Subdivision
New Construction
Conception
Brockton, MA 02301

Residences at Atlantic Country Club and Inclusionary Housing
New Construction, Infrastructure
Conception
$21,877,600 CJ est. value
Plymouth, MA 02360

Mary Lane Mixed Use Storage and Office Buildings
New Construction - 37,500 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Plymouth, MA

Keenes Mill Village
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Duxbury, MA 02332

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Mullikens Landing Trail Improvement Project
Infrastructure
Post-Bid
Kingston, MA 02364

DPW Cold Storage Building
Results
West Bridgewater, MA

Complete Streets Improvements along Gliniewicz Way and Lincoln Boulevard
Results
$370,668 est. value
Abington, MA 02351

850 Bedford Street - Warehouse
New Construction - 219,000 SF
Construction
Bridgewater, MA 02324

Middleborough Park Department - Basketball Court Re-Paving
Infrastructure
Construction
$150,000 CJ est. value
Middleborough, MA 02346

Tremont Nail Factory Redevelopment
New Construction
Pending Verification
Wareham, MA 02571

Main Street Battery Storage Warehouse
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Carver, MA 02330

Cranberry Highway Storage Facility
New Construction
Conception
Wareham, MA 02576

True Storage
New Construction - 60,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Wareham, MA 02576

ADA Building Access Town House
Infrastructure
Post-Bid
$85,000 est. value
Plympton, MA

Last Updated 01/27/2023 08:36 AM
Project Title

Town of Norwell Highway and Tree Department Operations Facility - GC

Physical Address View project details and contacts
City, State (County) Norwell, MA 02061   (Plymouth County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Warehouse/Storage, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $5,084,000 [brand] Estimate
Plans Available from Agency's Affiliate - 10/13/22
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of renovations and alterations to an existing approximate 5,695 gross square foot Highway Department building with a one-story approximate 16,593 gross square foot addition thereto including construction of a pre-engineered metal building for vehicle storage, additional administrative and employee support and workshop areas. Site work is limited to immediate areas surrounding the proposed structure and includes excavation, utility connections and subsurface drainage, re-grading and new curbs and sidewalks. All work will be conducted adjacent to active and occupied site and building areas and will be required to be performed in phased sequence such that the Operations Facility can remain fully in use without interruption. Location- 310 Main Street, Norwell, MA 02061 The contract duration is 755 calendar days from the date of the Notice to Proceed for all Phases/Alternate Scopes of Work, as follows: Mobilization Phase/ Procurement of Lead -time items: 60 Days Phase 1 Construction work: 485 Days Commencement of Phase 2 Construction Work (Alternate #1 & Alternate #2 if accepted): 30 Days after completion of Phase 1 Construction Phase 2 Construction Work (Alternate #1 & Alternate #2 if accepted): 180 Days Estimated project value is: $6,200,000 General bidder questions due date will be extended to November 20, 2022. All parties desiring to submit general and filed sub-bids must submit with their bids a copy of the Contractor's certificate of eligibility (DCAMM Form CQ7) and an update statement (DCAMM Form CQ3), in the work category of: General Contracting or sub-trade category as applicable. All general bids and all filed sub-bids shall be on a form provided by the Awarding Authority and accompanied by a bid deposit in the form of a certified, cashier's or treasurer's check issued by a responsible bank or trust company made payable to the Town of Norwell or a bid bond, in an amount not less than five percent (5%) of the value of the bid. Bid Bonds shall be in a form satisfactory to the Awarding Authority with a surety company that is qualified to do business in the Commonwealth of Massachusetts and conditioned upon the faithful performance by the principal of the agreements contained in the bid. The successful general bidder will be required to furnish a Performance Bond and a Payment Bond each in the amount of one hundred percent (100%) of the contract sum. Bonds shall be obtained from a surety licensed to do business in the Commonwealth of Massachusetts and the form shall be satisfactory to the Town of Norwell. The Town of Norwell will obtain the Builders' Risk Policy for the project. The Town of Norwell reserves the right to reject any or all bids, to waive any minor irregularities in the bidding, and to award this contract to other than the low bidder if deemed in the best interest of the Owner. The bidding shall be done in accordance with the by-laws of the Town of Norwell, and the laws of the Commonwealth of Massachusetts. Prevailing Wage rates do apply. All questions from Sub-bidders are due on or before November 1, 2022 at 2:00 PM via email to Ed Forte, Project Architect at eforte@fortearch.com. All questions from General Bidders are due on or before November 16, 2022 at 2:00 PM via email to: Ed Forte, Project Architect at eforte@fortearch.com. P.No- 2009.00, 4020

Details

22,288 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents