Similar Projects
Bellmar Village
New Construction, Infrastructure
Conception
$300,000,000 CJ est. value
Immokalee, FL 34142

Longwater Village
New Construction, Infrastructure - 65,000 SF
Conception
$250,000,000 CJ est. value
Naples, FL 34102

Old Naples Hotel at Third Street Plaza
Demolition, New Construction, Infrastructure - 3,800 SF
Design
$35,000,000 CJ est. value
Naples, FL 34102

Sidewalk/Milling and Resurfacing/Base Work
Infrastructure
Design
$4,361,899 CJ est. value
Everglades City, FL 34139

Taxiway A and B Safety Improvements
Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Naples, FL 34102

Signal Improvement at Airport Road and Poinciana Elementary School
Infrastructure
Bidding
$470,000 CJ est. value
Naples, FL 34102

Master Pump Station 302.00 Site Improvements
Alteration
Post-Bid
$2,085,000 est. value
FL

Emergency Service Center East Bay Enclosure Construction
Renovation, Infrastructure
Post-Bid
$2,400,000 CJ est. value
Naples, FL 34113

Lowdermilk Park - ATV Storage Building - Re-Bid
New Construction, Infrastructure - 9,000 SF
Results
$359,530 CJ est. value
Naples, FL 34102

North Quadrant Taxiway B Site Preparation
Infrastructure
Results
Naples, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Rooms To Go / Naples
New Construction, Infrastructure - 48,641 SF
Construction
$1,500,000 CJ est. value
Naples, FL 34103

Naples Beach Club Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$250,000,000 CJ est. value
Naples, FL 34102

St. Matthew's House Renovation
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Naples, FL 34112

1st Avenue South Improvements - 22C02 - City of Naples
Infrastructure
Conception
$6,272,000 CJ est. value
Naples, FL 34102

Last Updated 05/31/2023 08:06 AM
Project Title

Collier County Fire and EMS Station 74

Physical Address View project details and contacts
City, State (County) Naples, FL 34120   (Collier County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $8,157,587 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 10, 2022, the project has not been awarded. A timeline for award has not been confirmed. Project No-23-8105 Q & A deadline: 05/22/2023 PM EDT construction of the Collier County Fire and EMS Station 74 Project located in Collier County, Florida Contract duration: 515 days Contract renewal: Not Applicable Prices good for: 180 days

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents