Similar Projects
8th Street Commercial Buildings
New Construction, Infrastructure
Conception
$5,800,000 CJ est. value
Rogers, AR 72758

Twenty-Second Street Business Park
New Construction, Infrastructure - 20,312 SF
Conception
$3,300,000 CJ est. value
Rogers, AR 72756

Rogers Ped. Impts. (TAP-19) (S)
Infrastructure
Design
$500,000 CJ est. value
Rogers, AR 72756

Westside High School Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Design
$3,000,000 CJ est. value
Jonesboro, AR 72404

Detrola Motel
New Construction, Infrastructure
Bidding
$32,000,000 CJ est. value
Bentonville, AR 72712

Municipal Parks
Infrastructure
Bidding
$200,000 CJ est. value
Brookland, AR 72417

Tapestry Collection by Hilton / Rogers
New Construction, Infrastructure - 110,179 SF
Sub-Bidding
$34,000,000 CJ est. value
Rogers, AR 72758

New Multi-Purpose Courts Facility and Remodel of Existing Gym and Classrooms
New Construction
Post-Bid
Harrison, AR 72601

Rogers Services School Remodel Addition
Addition
Post-Bid
Rogers, AR 72758

High School Football Stadium Renovations
Renovation
Results
$300,000 est. value
Magnolia, AR 71753

Lakeside Middle School Cafeteria and ADA Toilet Addition
Addition, Demolition, Renovation, Infrastructure - 4,545 SF
Results
Lake Village, AR 71653

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

SW 4th and B Street Townhomes
New Construction, Infrastructure - 10,451 SF
Construction
$2,000,000 CJ est. value
Bentonville, AR 72712

Morning Star Subdivision
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Bentonville, AR 72712

Jiffy Trip #721 / Rogers
New Construction, Infrastructure
Pending Verification
$1,430,000 CJ est. value
Rogers, AR 72756

Last Updated 02/06/2023 04:08 PM
Project Title

Multi-Purpose Addition - Bid Package No 1 to 13

Physical Address View project details and contacts
City, State (County) Amity, AR 71921   (Clark County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $2,962,475 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Bid packages are as follows: Bid Package No. 1 General Contractor Bid Package No. 2 Earthwork Bid Package No. 3 Concrete Bid Package No. 4 Masonry Bid Package No. 5 Structural / Misc. Steel, Metal Wall Panels, Roofing, Sheetmetal & Trim Bid Package No. 6 Metal Studs, Drywall, Acoustical Ceilings Bid Package No. 7 Flooring Bid Package No. 8 Painting Bid Package No. 9 Plumbing Bid Package No. 10 HVAC Bid Package No. 11 Mechanical Combination: Plumbing & HVAC Bid Package No. 12 Electrical Bid Package No. 13 Fire Alarm Trade Contractors and Material Supplies may secure a copy of the proposed contract documents from the Construction Manager on a first come, first serve basis. These documents must be utilized and returned to the Construction Manager in a timely fashion. No partial sets will be issued. All bidders must be licensed in the State of Arkansas, as provided by Act 142 of 1967, amended by Act 293 of 1969 and Act 397 of 1971 and Act 546 of 1971, as enacted by the General Assembly of the State of Arkansas. The successful bidder will be required to furnish satisfactory performance and payment bond using AIA Document A312. The owner and construction manager reserve the right to waive any formality, or to reject any or all bids as necessary. No bid shall be withdrawn for a period of thirty (30) days subsequent to the opening of the bids, without written consent of the owner or construction manager. Hill & Cox Corporation reserves the right to reject any and all bids or waive any formalities as necessary.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents