Similar Projects
Annual Maintenance and Service HVAC and Plumbing Systems
Term Contract
Bidding
$240,000 est. value
Boston, Dedham, Everett, Newton, Revere, Somerville, MA

Furnace Replacement - General Bid
Alteration
Bidding
$258,000 est. value
Franklin, MA 02038

D'Angelis Water Treatment Plant PFAS Upgrades
Alteration
Sub-Bidding
$5,000,000 est. value
Millis, MA

Plumbing and Heating Materials and Supplies
Term Contract
Post-Bid
Quincy, MA

Burnham Boiler
Post-Bid
Less than $25,000 est. value
Walpole, MA

Pump Station Duct Cleaning and Repairs
Results
$468,000 est. value
Hingham, Quincy, MA 02043

2020 Pump Station Improvements Project - Filed Sub Bids
Results
$1,250,000 est. value
Weymouth, MA

HVAC Preventative Maintenance Contract
Alteration
Bidding
$180,000 est. value
Brookline, MA 02446

RTU Replacement and Associated Work
Post-Bid
Less than $350,000 est. value
Wellesley, MA 02481

Natatorium HVAC Renovations at Dedham Pool Building - General Bid
Results
Less than $700,000 est. value
Dedham, MA

Campus Police and Admissions Renovations - Filed Sub Bids
Post-Bid
Less than $500,000 est. value
Wellesley, MA 02481

Removal and Replacement of 7 Section Heating Unit
Results
Braintree, MA

Replacement of Boilers and Hot Water Tanks at Augustine Silva House
Post-Bid
Less than $25,000 est. value
Stoughton, MA 02072

Boiler Room Renovations
Results
$225,000 est. value
Braintree, MA 02184

Air Vent Cleaning of Aviation Hangars
Post-Bid

Reported 01/26/2022 12:00 AM
Project Title

Library Chiller

Physical Address View project details and contacts
City, State (County) Westwood, MA   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Town determined that the Chiller must be replaced with a more energy efficient chiller that includes an integrated ventilation optimization system. The reduced size chiller would ideally be in the size range of 70 Tons. The new solution will also entail integration into current BAS control system. The chiller to be replaced is currently a 110 Ton Smardt Chiller Model # SAA035-1EG12-4A3V which has become non-functional as a result of many control and operational failures.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents