Similar Projects
On-Call Emergency Repairs for Horizontal Utilities (Water, Sewer and Drain)
Infrastructure
Bidding
$150,000 est. value
Plymouth, MA

Fire Hydrants
Term Contract
Bidding
Brockton, MA

Purchase of Ductile, Cast Iron, and Steel Fittings
Term Contract
Post-Bid
Brockton, MA

Fire Hydrants
Term Contract
Post-Bid
Brockton, MA 02301

Construction of the Mill Street (Route 6) Water Main
Results
Less than $2,200,000 est. value
Marion, MA

Low Flow Toilets
Results
Less than $48,000 est. value
Pembroke, MA

Ductile, Cast Iron and Steel Fittings
Term Contract
Bidding
Brockton, MA

Water Materials and Supplies
Term Contract
Post-Bid
Marshfield, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

FY 21 Water Main Replacement Hingham and Hull
Infrastructure
Bidding
$1,550,000 est. value
Hingham, MA

Water Main Replacement Phase 4B
Post-Bid
$1,850,000 est. value
Scituate, MA

Repair Work to the Twin 24-Inch Diameter Water Transmission Mains
Results
Less than $35,000 est. value
Brockton, MA 02301

Water Transmission Main Valve Replacement, Phase 2
Infrastructure
Post-Bid
$1,000,000 est. value
Brockton, MA

Water Meters/Reading Equipment
Term Contract
Results
Hanover, MA

2021 Water Main Improvements for Thomas Street, Thomas Circle and Morse Avenue
Infrastructure
Post-Bid
$1,600,000 est. value
Brockton, MA

Last Updated 07/06/2021 11:47 AM
Project Title

Force Main Replacement Project

Physical Address View project details and contacts
City, State (County) Abington, MA   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,500,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract includes the installation of approximately 11,000 linear feet of new ´PVC force main, air release manholes, and isolation manholes. The proposed force main will be installed within existing roadways in close proximity to the existing force main. Work will be on Town roads: Summer Street, Vernon Street and on State roads: Brockton Avenue (Route 123) and Washington Street (Route 18). The proposed force main will make a final connection into the existing force main at the Summer Street Pump Station.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents