Similar Projects
Last Updated | 07/06/2021 11:47 AM |
Project Title | Force Main Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Abington, MA (Plymouth County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $4,500,000 |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work under this contract includes the installation of approximately 11,000 linear feet of new ´PVC force main, air release manholes, and isolation manholes. The proposed force main will be installed within existing roadways in close proximity to the existing force main. Work will be on Town roads: Summer Street, Vernon Street and on State roads: Brockton Avenue (Route 123) and Washington Street (Route 18). The proposed force main will make a final connection into the existing force main at the Summer Street Pump Station. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |