Similar Projects
Two Rivers North Wind Farm
New Construction, Infrastructure
Conception
$540,000,000 CJ est. value
Medicine Bow, WY 82329

Lucky Star Wind Farm
New Construction, Infrastructure
Conception
$650,000,000 CJ est. value
Medicine Bow, WY 82329

Regrading and Resurfacing Project
Infrastructure
Design
$359,000 CJ est. value
Cheyenne, WY 82001

SCSD 2 Maintenance Facility Safety Upgrades and Repairs
Renovation, Infrastructure - 9,360 SF
Design
$450,000 CJ est. value
Sheridan, WY 82801

WY NPS YELL 12(2) Yellowstone River Bridge
Demolition, New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Yellowstone National Park, WY 82190

Installation of New Parking Lot Lighting and Enhancement of Current Building Lighting; Air Traffic Control Tower
Infrastructure
Bidding
$60,000 CJ est. value
Casper, WY 82604

Owner`s Representative for the Horizontal Infrastructure and Site Planning and Development
Infrastructure
Post-Bid
Jackson, WY 83001

Avalon International Metal Building, Foundation, and Site Improvement Package
New Construction, Infrastructure
Post-Bid
Evanston, WY 82930

District 3 Stockpiles
Infrastructure
Results

Mammoth Lift Station Pumps - Yell
Term Contract
Results
Yellowstone National Park, WY 82190

Dinosolar Solar Energy System
Infrastructure
Pending Verification
$266,617,340 CJ est. value
Casper, WY 82604

Downtown Development Authority District Improvements - City Of Cheyenne
Infrastructure
Pending Verification
$6,000,000 CJ est. value
Cheyenne, WY 82001

Professional Architectural and Engineering Services for Level I Reconnaissance and Level II Feasibility Studies
Infrastructure
Conception
$2,000,000 CJ est. value
Cheyenne, WY 82002

Riverton Streets (Little Wind River Pedestrian Bridge)
Infrastructure
Design
$1,996,880 CJ est. value
Riverton, WY 82501

CCSD #1 New Aquatic Center
New Construction, Infrastructure - 46,600 SF
Bidding
$27,609,210 CJ est. value
Gillette, WY 82718

Last Updated 09/03/2022 07:19 AM
Project Title

Slate Creek Water Well Redrill Kfo

Physical Address View project details and contacts
City, State (County) Opal, WY 83124   (Lincoln County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All work done under this contract will be performed by a contractor currently licensed and in good standing with the Wyoming Board of Examining Water Well Drilling Contractors and Water Well Pump Installation Contractors. All water well work done under this contract will be completed in a manner as to meet or exceed the current State of Wyoming Minimum Well Construction Standards. Description of Work: Furnishing all labor, equipment, supplies, and materials, to drill, construct and develop one water well. Location: Work under this Contract is located in Lincoln County, Wyoming. The work location is shown on the drawings and listed on the Work Data Sheet. Work Data Sheet: Designates the type and quantity of work required at the project locations, and dimensions required for typical well construction. The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days. Rough order magnitude is between $25,000 and $100,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. complete the entire work ready for use not later than 90 calendar days after receipt of the notice to proceed. The time stated for completion shall include final cleanup of the premises.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents