Project Title | Slate Creek Water Well Redrill Kfo |
Physical Address | View project details and contacts |
City, State (County) | Opal, WY 83124 (Lincoln County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $100,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All work done under this contract will be performed by a contractor currently licensed and in good standing with the Wyoming Board of Examining Water Well Drilling Contractors and Water Well Pump Installation Contractors. All water well work done under this contract will be completed in a manner as to meet or exceed the current State of Wyoming Minimum Well Construction Standards. Description of Work: Furnishing all labor, equipment, supplies, and materials, to drill, construct and develop one water well. Location: Work under this Contract is located in Lincoln County, Wyoming. The work location is shown on the drawings and listed on the Work Data Sheet. Work Data Sheet: Designates the type and quantity of work required at the project locations, and dimensions required for typical well construction. The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days. Rough order magnitude is between $25,000 and $100,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. complete the entire work ready for use not later than 90 calendar days after receipt of the notice to proceed. The time stated for completion shall include final cleanup of the premises. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |