Similar Projects
Z--Hofu Upgrade HVAC ,Paint & ore Museum Collection
Design
$1,000,000 to $5,000,000 est. value
Elverson, PA

H241--Exhaust Hood Cleaning
Bidding
Coatesville, PA 19320

J--Cooler Tower Cleaning Coatesville VAMC
Post-Bid
Coatesville, PA 19320

Z2DA--D/B Renovate SPS 542-21-206
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Coatesville, PA 19320

A/C Upgrade at Devon Elementary School
Results
Wayne, PA 19087

Ambulance Bay & Interior Renovations - HVAC/Mechanical
Results
West Brandywine Township, PA

Rehabilitation of Building 19, Frick`s Lock Village Trailhead – Schuylkill River Trail - HVAC
Post-Bid
Pottstown, PA 19464

Maintenance for Fire Extinguishers and Kitchen Hood Systems
Term Contract
Results
West Chester, PA 19383

HVAC Renovations and Upgrades
Post-Bid
Berwyn, Devon, Wayne, PA 19312

Multi-Purpose Room RTU Replacement at the East Goshen Elementary School Mechanical Contract
Results
Exton, PA 19341

HVAC and Mechanical Products
Term Contract
Post-Bid

Chiller Plant Replacement at Owen J. Roberts High School
Results
Pottstown, PA 19464

J041--Exhaust Hood Cleaning
Post-Bid
Coatesville, PA 19320

New High School Project - Contract No. 2 HVAC Construction
Results
$10,500,000 est. value
West Grove, PA

Boiler Replacement
Renovation
Post-Bid
Pottstown, PA

Last Updated 01/30/2020 08:39 AM
Project Title

A/C Upgrade at New Eagle Elementary School

Physical Address View project details and contacts
City, State (County) Wayne, PA 19087   (Chester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consist of providing and installing new mechanical equipment in various locations for air conditioning of the existing building. Mechanical Construction contract includes new condensing units for existing unit ventilators, new roof top units with ductwork, new mini-split systems, and new HVAC web-based control systems. Electrical Construction contract includes branch circuit power for all new HVAC systems and modification to fire alarm systems. General Construction contract includes roof curbs, equipment supports, structural reinforcing of roof, concrete pads with gates/fencing, and ceiling modifications for the running of ductwork, condensate lines, and electrical infrastructure. In addition, the Electrical Construction contract at New Eagle Elementary School includes new electrical service upgrade with new MDP, new power distribution for new electrical panels.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents