Similar Projects
Construct Fire Protection Water Storage Tank ?? EM to see if same as 2185108- Tanks sizes are different but project dates/site visits exactly SAME
Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Enid, OK

2.0 MG Elevated Storage Tower - 33 Road and Kelly TWR-4
Infrastructure
Results
Edmond, OK

2022 Sand Storage Silo Bailey Ranch Golf Club
Infrastructure
Results
Owasso, OK 74055

Kingfisher Disinfection Byproduct Reduction
Infrastructure
Results
Kingfisher, OK

Clearwell Rehabilitation
Infrastructure
Results
Ponca City, OK 74601

Tall I-35 Tower Rehabilitation Project
Infrastructure
Results
Edmond, OK 73034

Plating Tank Repair
Post-Bid
Oklahoma City, OK

2021 Water System Improvements - Mingo Water Storage Tank Rehabilitation
Infrastructure
Results
Bixby, OK

Underground Storage Tank Removal - JHCC
Infrastructure
Results
$482,925 est. value
Lexington, OK 73051

Refurbishing Water Towers
Infrastructure
Post-Bid
$109,000 est. value
Custer City, OK

Water Tower Repair
Renovation
Results
El Reno, OK 73036

Water Storage Tank Improvements
Infrastructure
Results
$550,000 to $560,000 est. value
Porter, OK 74454

Construct Fire Protection Water Tank & System, Multi
New Construction, Demolition
Post-Bid
$1,000,000 to $5,000,000 est. value
Enid, OK 73701

Last Updated 04/28/2022 08:41 AM
Project Title

Repair Water Distribution System, Multi

Physical Address View project details and contacts
City, State (County) Enid, OK 73705   (Garfield County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of constructing a new potable water 1.5 MG elevated storage tank with a pump house and chlorine booster station on the base of the tank; and the removal and replacement of 60,800 LF of ductile iron main lines base wide. In addition, non-PVC service lines will be replaced with PVC lines new water meters will be installed in some buildings; and fire hydrants and fire lines will be removed/replaced or added as stated on plans. Demolition work includes demolishing existing potable water 0.5 MG elevated storage tank, existing 0.3 MG ground storage tank and booster pump station.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents