Similar Projects
Interchange Modification on I-55 at Crump Boulevard (L.M. 11.05 - L.M. 12.02)
Renovation, Infrastructure
Bidding

13th Street Bridge Repair
Renovation, Infrastructure
Bidding
Little Rock, AR

Saline County Old River Bridge Phase 2
New Construction
Post-Bid
AR

Parker Branch Road Vehicular Bridge
Results
Fayetteville, AR

Districts 1, 2 and 6 Bridge Preservation (2021)
New Construction
Results

Bridge Replacement on Middle Road
Renovation, Infrastructure
Bidding
Conway, AR

Districts 3 and 7 Bridge Preservation (2021)
New Construction
Results

Districts 5 and 10 Bridge Preservation
New Construction
Results

Big Creek Road Bridge Construction
New Construction
Results
Batesville, AR

Districts 8 and 9 Bridge Preservation (2021)
New Construction
Results

Stillhouse Branch Pedestrian Bridge Replacement
New Construction, Infrastructure
Results
Batesville, AR

Cadron Creek STR and Apprs (S)
New Construction, Infrastructure
Results
AR

Rehabilitation and Improvement of the Arkansas River Lift Bridge Project
Infrastructure
Results
Fort Smith, AR 72903

Double Springs Road Bridge Rehabilitation
Renovation
Results
$25,960,515 est. value
Fayetteville, AR

Uppr Str. and Apprs. (Mcgehee) (s)
New Construction
Results
AR

Reported 03/03/2022 12:00 AM
Project Title

Plainview Bridge Repair

Physical Address View project details and contacts
City, State (County) White Hall, AR 71602   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

It is 244ft in length, deck width is 35ft, curb to curb is 28ft, there are 5 beams per span with the max span length of 46ft. Contractor shall be responsible for all coordination with Union Pacific railroads before construction work can begin on the bridge. Contractor shall supply all supervision, labor, materials and equipment for bridge repair.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents