Similar Projects
Fairbridge Inn Renovation
Renovation
Conception
$95,000,000 CJ est. value
Kalispell, MT 59901

Spring Creek Park Subdivision
New Construction
Conception
Kalispell, MT 59901

The Charles Hotel
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

The Charles Hotel
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Mill/Fill Overlay MT HWY 40 Kalispell Area
Alteration
Post-Bid
Kalispell, MT

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

Kalispell City Airport Hangars
New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Kalispell, MT 59901

Kalispell City Airport Hangars
New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Kalispell, MT 59901

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Willow Glen Wash Bay Addition - RB0218-03008 - Flathead County
Addition, Demolition, Renovation, Infrastructure
Conception
$1,026,250 CJ est. value
Kalispell, MT 59901

Meadow Lake Boulevard Apartments
New Construction
Design
Columbia Falls, MT 59912

Overlay and Chip Seal Lodgepole Road Kalispell Area
Alteration
Post-Bid

Last Updated 04/24/2023 08:37 AM
Project Title

The Harper

Physical Address View project details and contacts
City, State (County) Kalispell, MT 59901   (Flathead County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Fitness Center, Gas Station, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 40-unit multi-family development and a Jiffy Lube. As of April 2023, this project is on hold indefinitly.

Details

4 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Panel Doors, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents