Similar Projects
Amherst Central High School - Capital Improvement Project - Amherst Central School District
Renovation, Infrastructure
Conception
$34,290,116 CJ est. value
Buffalo, NY 14226

Community Athletic Complex
New Construction
Design
Buffalo, NY 14216

Amherst Middle School - Capital Improvement Project - Amherst Central School District
Infrastructure, Renovation
Design
$15,219,329 CJ est. value
Amherst, NY 14226

Kenmore - Town of Tonawanda UFSD 2020 Capital Improvements Project - Phase 2B
Renovation
Post-Bid
$1,750,000 to $10,600,000 est. value
Buffalo, Tonawanda, NY 14223

Kenmore - Town of Tonawanda UFSD 2020 Capital Improvements Project - Phase 2B
Renovation
Post-Bid
$1,750,000 to $10,600,000 est. value
Buffalo, Tonawanda, NY 14223

Lancaster CSD Capital Improvements 2018
Renovation
Results
$397,000 to $2,457,000 est. value
Lancaster, NY 14086

North Tonawanda City Schools Smart Schools Bond Act Project
Renovation
Results
North Tonawanda, NY 14120

Buffalo Public Schools - School 66 North Park Community School
Renovation, Addition - 13,700 SF
Construction
Buffalo, NY 14216

The Summit Center - Addition & Renovations
New Construction, Renovation, Addition - 16,500 SF
Construction
$2,000,000 to $2,300,000 est. value
Buffalo, NY 14228

Buffalo Academy of Science Charter School
New Construction, Infrastructure - 70,000 SF
Pending Verification
$20,000,000 CJ est. value
Buffalo, NY 14202

School 3 - 2021 Referendum - Clifton School Board
Renovation
Pending Verification
$8,742,910 CJ est. value
Buffalo, NY 14217

Smallwood Drive Elementary - Capital Improvement Project - Amherst Central School District
Renovation, Infrastructure
Design
$7,481,894 CJ est. value
Buffalo, NY 14226

Buffalo Academy Of Science Pool In-Fill
Renovation - 4,760 SF
Post-Bid
Buffalo, NY 14202

King Center Charter School - Classroom Reconfiguration Project
Renovation - 3,000 SF
Results
$150,000 est. value
Buffalo, NY 14215

650 Ridge Road - Building Improvements
Renovation - 2,446 SF
Construction
$265,000 est. value
Lackawanna, NY 14218

Last Updated 06/16/2023 05:01 PM
Project Title

District-Wide Air Conditioning - Phase 2 - Depew Union Free School District

Physical Address View project details and contacts
City, State (County) Depew, NY 14043   (Erie County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $9,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 16, 2023, the District is currently in the design process for Phase Two of the project. Phase 1 has began construction. Further details regarding design and construction have not been identified. A firm timeline for construction has not been established. A detailed scope has not been released. The core objectives of Phase Two include HVAC upgrades and toilet room renovations at both the Middle School and High School, as well as renovations of the tennis courts, a technology suite and a security vestibule at the High School. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents